|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/13/2019 Measured TD: 16995 ft. Vertical TD: 6965 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/13/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/14/2020 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 1230 FNL 1491 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 331 FNL 1486 FWL | | Proposed Depth/Form: | 17089 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17079 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2022, Top: , Bottom: 17079 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/15/2018 | | Spud Date: | 5/5/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 16995 ft. | Measured PB depth: | 16974 ft. | | True Vertical TD: | 6965 ft. | True Vertical PB depth: | 6965 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 1345 FNL 1492 FWL | | Bottom Hole Location: | Sec:1 Twp: 1N 65W | Footage: 339 FNL 1499 FWL | | Log Types: | CBL, MWD/LWD. (DIL on 05-123-25613 and 05-123-22222). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1837 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 481, Top: 0 ft., Bottom: 1837 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16985 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1590, Top: 1162 ft., Bottom: 16995 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1379 ft. | | | | | PARKMAN | 3989 ft. | | | | | SUSSEX | 4442 ft. | | | | | SHARON SPRINGS | 7047 ft. | | | | | NIOBRARA | 7163 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/13/2019 Interval Top: 7348 ft. Interval Bottom: 16956 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/17/2019 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/5/2019 | Treatment End Date: | 2/20/2019 | | Treatment Summary: | PERF AND FRAC FROM 7348-16956.
48 BBL 15% HCL ACID, 920 BBL 7.5% HCL ACID, 15,301 BBL PUMP DOWN, 310,523 BBL SLICKWATER, 326,792 TOTAL FLUID, 7,485,947# 40/70 OTTAWA/ST. PETERS, 7,485,947# TOTAL SAND. | | Total fluid used in treatment (bbls): | 326792 | Max pressure during treatment (psi): | 7867 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 49 | | Total acid used in treatment (bbls): | 968 | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | 1350 | Total flowback volume recovered (bbls): | 15265 | | Fresh water used in treatment (bbls): | 324474 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 7485947 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6909 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 260 | | BBLS_OIL | 69 | | BTU_GAS | 1280 | | CALC_BBLS_H2O | 260 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 1391 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 44 | | MCF_GAS | 96 | | TUBING_PRESS | 2000 |
| | Perforation Data: | | Interval Top: | 7348 ft. | # Of Holes: | 1536 | | Interval Bottom: | 16956 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4517 |
| Total Gas Produced (MCF) | 86029 |
| GOR | 19045 |
| GOR Determination | MCFE |
| Average BOE per Day | 52.236 |
| Average MCFE per Day | 302.958 |
| Federal Financial Assurance | i | |
|
|