|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2019 Measured TD: 18073 ft. Vertical TD: 7383 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/14/2020 | Prop Depth/Form: | 18551 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 40, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18551 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2978, Top: 0 ft., Bottom: 18551 ft. |
| | |
Wellbore Completed | Completion Date: | 5/15/2018 | Spud Date: | 3/25/2018 | Spud Date Is: | ACTUAL | Measured TD: | 18073 ft. | Measured PB depth: | 18039 ft. | True Vertical TD: | 7383 ft. | True Vertical PB depth: | 7383 ft. | Top PZ Location: | Sec:27 Twp: 7N 66W | Footage: 335 FSL 572 FEL | Depth | Bottom Hole Location: | Sec:28 Twp: 7N 66W | Footage: 352 FSL 330 FWL | Depth | Log Types: | MWD, Mud, CBL, (DIL in API 123-32205) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 415, Top: 0 ft., Bottom: 1553 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18066 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2815, Top: 0 ft., Bottom: 18073 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4005 ft. | | N | N | SUSSEX | 4413 ft. | | N | N | SHANNON | 4705 ft. | | N | N | SHARON SPRINGS | 7333 ft. | | N | N | NIOBRARA | 7353 ft. | | N | N | FORT HAYS | 7777 ft. | | N | N | CODELL | 7941 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 10/8/2019 Interval Top: 17375 ft. Interval Bottom: 17515 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 1/15/2019 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/1/2018 | Treatment End Date: | 12/15/2018 | Treatment Summary: | Completed Depths: 17,375'-17,515' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 17375 ft. | # Of Holes: | 1680 | Interval Bottom: | 17515 ft. | Hole Size: | 0.33 in. |
|
Formation CARL Formation Classification: OW Status: CM - 10/8/2019 Interval Top: 9215 ft. Interval Bottom: 12370 ft. Completed Information for Formation CARLILE | 1st Production Date: | 1/15/2019 | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/1/2018 | Treatment End Date: | 12/15/2018 | Treatment Summary: | Completed Depths: 9,215'-10,125', 12,140'-12,370' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 9215 ft. | # Of Holes: | 1680 | Interval Bottom: | 12370 ft. | Hole Size: | 0.33 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 1/15/2019 Interval Top: 8111 ft. Interval Bottom: 17969 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 1/15/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/1/2018 | Treatment End Date: | 12/15/2018 | Treatment Summary: | Performed 52 Stage Frac, using a total of 10,635,300 lbs Sand, Total Fluid used 627,614 bbls, Max PSI 8189, Total of 1680 holes, Perf. Diam. 0.33", Total Acid 15% HCl 440 bbls. | Total fluid used in treatment (bbls): | 627614 | Max pressure during treatment (psi): | 8189 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 52 | Total acid used in treatment (bbls): | 440 | Min frac gradient (psi/ft): | 1.09 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 95412 | Fresh water used in treatment (bbls): | 627174 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 10635300 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/15/2019 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1999 | BBLS_OIL | 242 | BTU_GAS | 1280 | CALC_BBLS_H2O | 1999 | CALC_BBLS_OIL | 242 | CALC_GOR | 934 | CALC_MCF_GAS | 226 | CASING_PRESS | 2400 | GRAVITY_OIL | 42 | MCF_GAS | 226 |
| Perforation Data: | Interval Top: | 8111 ft. | # Of Holes: | 1680 | Interval Bottom: | 17969 ft. | Hole Size: | 0.33 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/8/2019 Interval Top: 8111 ft. Interval Bottom: 17969 ft. Completed Information for Formation CODELL | 1st Production Date: | 1/15/2019 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/1/2018 | Treatment End Date: | 12/15/2018 | Treatment Summary: | Completed Depths: 8,111'-9,215', 10,125'-12,140', 12,370'-17,375', 17,515'-17,969' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8111 ft. | # Of Holes: | 1680 | Interval Bottom: | 17969 ft. | Hole Size: | 0.33 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 15822 |
Total Gas Produced (MCF) | 17037 |
GOR | 1076 |
GOR Determination | BOE |
Average BOE per Day | 51.227 |
Average MCFE per Day | 297.113 |
Federal Financial Assurance | i | |
|
|