Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46276
Well Classification: OW Status: PR - 1/1/2019
Well Name/No:G & D Hanks #W-27-28HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2019
FacilityID:453745LocationID:453331
County:WELD #123Location:SWSE 27 7N66W 6
Field:WATTENBERG - #90750Elevation:4874 ft.
Planned Location:1153FSL  1575 FELLat/Long: 40.541883 / -104.759854Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.541844 / -104.759856Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/1/2018
End Date: 12/15/2018
Reported: 5/7/2019
Days to report: 143
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2019             Measured TD: 18073 ft.    Vertical TD: 7383 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/14/2020
Prop Depth/Form:18551 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 40, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18551 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2978, Top: 0 ft., Bottom: 18551 ft.

Wellbore Completed
Completion Date:5/15/2018
Spud Date:3/25/2018Spud Date Is:ACTUAL
Measured TD:18073 ft.Measured PB depth:18039 ft.
True Vertical TD:7383 ft.True Vertical PB depth:7383 ft.
Top PZ Location:Sec:27 Twp: 7N 66WFootage: 335 FSL  572 FELDepth
Bottom Hole Location:Sec:28 Twp: 7N 66WFootage: 352 FSL  330 FWLDepth
Log Types:MWD, Mud, CBL, (DIL in API 123-32205)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 415, Top: 0 ft., Bottom: 1553 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18066 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2815, Top: 0 ft., Bottom: 18073 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4005 ft.NN
SUSSEX4413 ft.NN
SHANNON4705 ft.NN
SHARON SPRINGS7333 ft.NN
NIOBRARA7353 ft.NN
FORT HAYS7777 ft.NN
CODELL7941 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/8/2019                 Interval Top: 17375 ft.    Interval Bottom: 17515 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:1/15/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2018Treatment End Date:12/15/2018
Treatment Summary:Completed Depths: 17,375'-17,515'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:17375 ft.# Of Holes:1680
Interval Bottom:17515 ft.Hole Size:0.33 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/8/2019                 Interval Top: 9215 ft.    Interval Bottom: 12370 ft.

 Completed Information for Formation CARLILE
1st Production Date:1/15/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2018Treatment End Date:12/15/2018
Treatment Summary:Completed Depths: 9,215'-10,125', 12,140'-12,370'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9215 ft.# Of Holes:1680
Interval Bottom:12370 ft.Hole Size:0.33 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/15/2019                 Interval Top: 8111 ft.    Interval Bottom: 17969 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:1/15/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2018Treatment End Date:12/15/2018
Treatment Summary:Performed 52 Stage Frac, using a total of 10,635,300 lbs Sand, Total Fluid used 627,614 bbls, Max PSI 8189, Total of 1680 holes, Perf. Diam. 0.33", Total Acid 15% HCl 440 bbls.
Total fluid used in treatment (bbls):627614Max pressure during treatment (psi):8189
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):440Min frac gradient (psi/ft):1.09
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):95412
Fresh water used in treatment (bbls):627174Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10635300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/15/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1999
BBLS_OIL 242
BTU_GAS 1280
CALC_BBLS_H2O 1999
CALC_BBLS_OIL 242
CALC_GOR 934
CALC_MCF_GAS 226
CASING_PRESS 2400
GRAVITY_OIL 42
MCF_GAS 226
Perforation Data:
Interval Top:8111 ft.# Of Holes:1680
Interval Bottom:17969 ft.Hole Size:0.33 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/8/2019                 Interval Top: 8111 ft.    Interval Bottom: 17969 ft.

 Completed Information for Formation CODELL
1st Production Date:1/15/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2018Treatment End Date:12/15/2018
Treatment Summary:Completed Depths: 8,111'-9,215', 10,125'-12,140', 12,370'-17,375', 17,515'-17,969'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8111 ft.# Of Holes:1680
Interval Bottom:17969 ft.Hole Size:0.33 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)15822
Total Gas Produced (MCF)17037
GOR1076
GOR DeterminationBOE
Average BOE per Day51.227
Average MCFE per Day297.113

 Federal Financial Assurance  i 

 Tribal Well  i No