Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46254
Well Classification: OW Status: PR - 5/21/2019
Well Name/No:VERDE #13-10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/21/2019
FacilityID:453678LocationID:453676
County:WELD #123Location:NENW 13 1N66W 6
Field:WATTENBERG - #90750Elevation:5073 ft.
Planned Location:903FNL  2587 FWLLat/Long: 40.056070 / -104.725670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.056071 / -104.725671Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/16/2019
End Date: 2/24/2019
Reported: 4/18/2019
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/21/2019             Measured TD: 18789 ft.    Vertical TD: 7501 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/21/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/8/2020
Proposed Top PZ Location:Sec:13 Twp: 1N 66W Footage: 366 FNL  2370 FEL
Bottom Hole Location:Sec:1 Twp: 1N 66W Footage: 53 FNL  2357 FEL
Proposed Depth/Form:18701 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18691 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2219, Top: , Bottom: 18691 ft.

Wellbore Completed
Completion Date:5/15/2018
Spud Date:2/27/2018Spud Date Is:ACTUAL
Measured TD:18789 ft.Measured PB depth:18768 ft.
True Vertical TD:7501 ft.True Vertical PB depth:7500 ft.
Top PZ Location:Sec:13 Twp: 1N 66WFootage: 456 FNL  2360 FEL
Bottom Hole Location:Sec:1 Twp: 1N 66WFootage: 54 N  2357 E
Log Types:LWD/GR, CBL, RESISTIVITY RUN ON THE VERDE 13-18HZ (API: 05-123-46258).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1878 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 673, Top: 0 ft., Bottom: 1878 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18778 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1750, Top: 1640 ft., Bottom: 18789 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1601 ft.
PARKMAN4318 ft.
SUSSEX4671 ft.
SHARON SPRINGS7201 ft.
NIOBRARA7231 ft.
FORT HAYS7764 ft.
CODELL7871 ft.
CARLILE12443 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 6/10/2019                 Interval Top: 12443 ft.    Interval Bottom: 18507 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/10/2019Treatment End Date:N/A
Treatment Summary:12443-13366, 15467-15640, 15744-15783, 18348-18507
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12443 ft.# Of Holes:672
Interval Bottom:18507 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/10/2019                 Interval Top: 9607 ft.    Interval Bottom: 12301 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/10/2019Treatment End Date:N/A
Treatment Summary:9607-9933, 10675-10690, 12013-12043, 12253-12301
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9607 ft.# Of Holes:672
Interval Bottom:12301 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/21/2019                 Interval Top: 7893 ft.    Interval Bottom: 18746 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/15/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/16/2019Treatment End Date:2/24/2019
Treatment Summary:PERF AND FRAC FROM 7893-18746. 650 BBL 15% HCL ACID; 11,114 BBL PUMP DOWN; 190,185 BBL SLICKWATER; 201,949 TOTAL FLUID; 5,876,420# 40/70 GENOA/SAND HILLS; 5,876,420# TOTAL SAND.
Total fluid used in treatment (bbls):201949Max pressure during treatment (psi):7891
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):650Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):1050Total flowback volume recovered (bbls):10121
Fresh water used in treatment (bbls):200249Disposition method For flowback:RECYCLE
Total proppant used (lbs):58764200Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7538 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/21/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 176
BBLS_OIL 133
BTU_GAS 1306
CALC_BBLS_H2O 176
CALC_BBLS_OIL 133
CALC_GOR 880
CALC_MCF_GAS 117
CASING_PRESS 2200
GRAVITY_OIL 51
MCF_GAS 117
TUBING_PRESS 1600
Perforation Data:
Interval Top:7893 ft.# Of Holes:672
Interval Bottom:18746 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/10/2019                 Interval Top: 7893 ft.    Interval Bottom: 18746 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/10/2019Treatment End Date:N/A
Treatment Summary:7893-9607, 9933-10675, 10690-12013, 12043-12253, 12301-12443, 13366-15467, 15640-15744, 15783-18348, 18507-18746
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7893 ft.# Of Holes:672
Interval Bottom:18746 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)7653
Total Gas Produced (MCF)199128
GOR26019
GOR DeterminationMCFE
Average BOE per Day114.654
Average MCFE per Day664.983

 Federal Financial Assurance  i 

 Tribal Well  i No