Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46250
Well Classification: OW Status: PR - 5/20/2019
Well Name/No:VERDE #13-13HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/20/2019
FacilityID:453673LocationID:453676
County:WELD #123Location:NWNE 13 1N66W 6
Field:WATTENBERG - #90750Elevation:5075 ft.
Planned Location:904FNL  2631 FELLat/Long: 40.056069 / -104.725403Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.056068 / -104.725404Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/4/2019
End Date: 4/1/2019
Reported: 6/4/2019
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/20/2019             Measured TD: 18665 ft.    Vertical TD: 7305 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/20/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/8/2020
Proposed Top PZ Location:Sec:13 Twp: 1N 66W Footage: 370 FNL  1593 FEL
Bottom Hole Location:Sec:1 Twp: 1N 66W Footage: 52 FNL  1545 FEL
Proposed Depth/Form:18593 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18583 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2206, Top: , Bottom: 18583 ft.

Wellbore Completed
Completion Date:4/26/2018
Spud Date:3/1/2018Spud Date Is:ACTUAL
Measured TD:18665 ft.Measured PB depth:18660 ft.
True Vertical TD:7305 ft.True Vertical PB depth:7305 ft.
Top PZ Location:Sec:13 Twp: 1N 66WFootage: 340 FNL  1570 FEL
Bottom Hole Location:Sec:1 Twp: 1N 66WFootage: 53 N  1571 E
Log Types:LWD/GR, CBL, RESISTIVITY RUN ON THE VERDE 13-18HZ (API: 05-123-46258).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1878 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 673, Top: 0 ft., Bottom: 1878 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18660 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1730, Top: 1324 ft., Bottom: 18665 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1616 ft.
PARKMAN4421 ft.
SUSSEX4778 ft.
SHARON SPRINGS7362 ft.
NIOBRARA7418 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/20/2019                 Interval Top: 7819 ft.    Interval Bottom: 9280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/15/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/4/2019Treatment End Date:4/1/2019
Treatment Summary:PERF AND FRAC FROM 7819-9280. 167 BBL 15% HCL ACID; 2,484 BBL PUMP DOWN; 52,853 BBL SLICKWATER; 55,504 TOTAL FLUID; 1,845,640# 40/70 OTTAWA/ST. PETERS; 1,845,640# TOTAL SAND.
Total fluid used in treatment (bbls):55504Max pressure during treatment (psi):7912
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):167Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4967
Fresh water used in treatment (bbls):55337Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1845640Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7373 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/20/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 109
BBLS_OIL 83
BTU_GAS 1306
CALC_BBLS_H2O 109
CALC_BBLS_OIL 83
CALC_GOR 1675
CALC_MCF_GAS 139
CASING_PRESS 2800
GRAVITY_OIL 51
MCF_GAS 139
TUBING_PRESS 1600
Perforation Data:
Interval Top:7819 ft.# Of Holes:224
Interval Bottom:9280 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)126
Total Gas Produced (MCF)3813
GOR30261
GOR DeterminationMCFE
Average BOE per Day2.145
Average MCFE per Day12.411

 Federal Financial Assurance  i 

 Tribal Well  i No