|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2024 Measured TD: 12115 ft. Vertical TD: 7628 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/20/2019 | Proposed Top PZ Location: | Sec:25 Twp: 1N 66W | Footage: 2426 FSL 776 FWL | Bottom Hole Location: | Sec:25 Twp: 1N 66W | Footage: 2440 FSL 465 FEL | Proposed Depth/Form: | 12171 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.05 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2386 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1029, Top: 0 ft., Bottom: 2386 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12171 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2205, Top: 0 ft., Bottom: 12171 ft. |
| | |
Wellbore Completed | Completion Date: | 8/16/2018 | Spud Date: | 5/22/2018 | Spud Date Is: | ACTUAL | Measured TD: | 12115 ft. | Measured PB depth: | 12082 ft. | True Vertical TD: | 7628 ft. | True Vertical PB depth: | 7628 ft. | Top PZ Location: | Sec:25 Twp: 1N 66W | Footage: 2426 FSL 776 FWL | Bottom Hole Location: | Sec:25 Twp: 1N 66W | Footage: 2440 S 465 E | Log Types: | MUD, MWD/LWD, Surface CBL, Production CBL, VDL | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 58, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2414 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 923, Top: 0 ft., Bottom: 2428 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12097 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1529, Top: 2436 ft., Bottom: 12115 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4820 ft. | | N | N | SHANNON | 5458 ft. | | N | N | TEEPEE BUTTES | 6702 ft. | | N | N | SHARON SPRINGS | 7298 ft. | | N | N | NIOBRARA | 7314 ft. | | N | N | FORT HAYS | 8065 ft. | | N | N | CODELL | 8276 ft. | | N | N | CARLILE | 10373 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 11/16/2020 Interval Top: 10373 ft. Interval Bottom: 10824 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/16/2020 | Treatment End Date: | N/A | Treatment Summary: | Carlile: 10373-10824 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 10373 ft. | # Of Holes: | 355 | Interval Bottom: | 10824 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 11/16/2020 Interval Top: 8276 ft. Interval Bottom: 12070 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/16/2020 | Treatment End Date: | N/A | Treatment Summary: | Codell: 8276-8907, 8987-10372, 10825-12070 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8276 ft. | # Of Holes: | 355 | Interval Bottom: | 12070 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: PR - 10/1/2024 Interval Top: 8075 ft. Interval Bottom: 12070 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 5/1/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/18/2019 | Treatment End Date: | 2/25/2019 | Treatment Summary: | 98702 bbls of water, 113 bbls of recycled water, 197 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z, BHL-68W, ACI-97, ASF-67, LGA-3J and 96 bbl HCL in a 15 stage frac with 2185540 lbs of silica quartz proppant and 825 lb of calcium chloride.
| Total fluid used in treatment (bbls): | 99108 | Max pressure during treatment (psi): | 8923 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 15 | Total acid used in treatment (bbls): | 96 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | 113 | Total flowback volume recovered (bbls): | 9575 | Fresh water used in treatment (bbls): | 98899 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2185540 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7769 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/9/2019 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 645 | BBLS_OIL | 559 | BTU_GAS | 1302 | CALC_BBLS_H2O | 645 | CALC_BBLS_OIL | 559 | CALC_GOR | 807 | CALC_MCF_GAS | 451 | CASING_PRESS | 1200 | GRAVITY_OIL | 37 | MCF_GAS | 451 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 8075 ft. | # Of Holes: | 355 | Interval Bottom: | 12070 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/16/2020 Interval Top: 8075 ft. Interval Bottom: 8986 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/16/2020 | Treatment End Date: | N/A | Treatment Summary: | Ft Hays: 8075-8275, 8963-8986 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8075 ft. | # Of Holes: | 355 | Interval Bottom: | 8986 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 7 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.003 |
Average MCFE per Day | 0.019 |
Federal Financial Assurance | i | |
|
|