|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/11/2019 Measured TD: 12862 ft. Vertical TD: 7491 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/11/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/17/2019 | Proposed Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 50 FSL 2633 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 470 FNL 2635 FEL | Proposed Depth/Form: | 12822 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12812 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1501, Top: , Bottom: 12812 ft. |
| | |
Wellbore Completed | Completion Date: | 5/12/2018 | Spud Date: | 2/15/2018 | Spud Date Is: | ACTUAL | Measured TD: | 12862 ft. | Measured PB depth: | 12840 ft. | True Vertical TD: | 7491 ft. | True Vertical PB depth: | 7491 ft. | Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 72 FSL 2643 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 478 N 2664 E | Log Types: | GR/LWD, CBL, CNL RUN ON THE AZUL 13-14HZ WELL (API: 05-123-46107). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1872 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 684, Top: 0 ft., Bottom: 1872 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12852 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1145, Top: 2098 ft., Bottom: 12862 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1631 ft. | | | | PARKMAN | 4374 ft. | | | | SUSSEX | 4752 ft. | | | | SHARON SPRINGS | 7387 ft. | | | | NIOBRARA | 7418 ft. | | | | FORT HAYS | 8101 ft. | | | | CODELL | 9434 ft. | | | | CARLILE | 10410 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 5/22/2019 Interval Top: 10410 ft. Interval Bottom: 12242 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/22/2019 | Treatment End Date: | N/A | Treatment Summary: | 10410-10606, 10737-10963, 11027-12242 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 10410 ft. | # Of Holes: | 288 | Interval Bottom: | 12242 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/22/2019 Interval Top: 9434 ft. Interval Bottom: 12821 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/22/2019 | Treatment End Date: | N/A | Treatment Summary: | 9434-10410, 10606-10737, 10963-11027, 12242-12821 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 9434 ft. | # Of Holes: | 288 | Interval Bottom: | 12821 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 5/11/2019 Interval Top: 8134 ft. Interval Bottom: 12821 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 4/11/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/23/2019 | Treatment End Date: | 2/25/2019 | Treatment Summary: | PERF AND FRAC FROM 8134-12821.
71 BBL 15% HCL ACID, 50 BBL 7.5% HCL ACID, 3,976 BBL PUMP DOWN, 82,843 BBL SLICKWATER, 86,940 TOTAL FLUID, 2,501,072# 40/70 OTTAWA/ST. PETERS, 2,501,072# TOTAL SAND. | Total fluid used in treatment (bbls): | 86940 | Max pressure during treatment (psi): | 7730 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 12 | Total acid used in treatment (bbls): | 121 | Min frac gradient (psi/ft): | 0.91 | Recycled water used in treatment (bbls): | 450 | Total flowback volume recovered (bbls): | 7814 | Fresh water used in treatment (bbls): | 86369 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2501072 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7666 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 244 | BBLS_OIL | 139 | BTU_GAS | 1280 | CALC_BBLS_H2O | 244 | CALC_BBLS_OIL | 139 | CALC_GOR | 1885 | CALC_MCF_GAS | 262 | CASING_PRESS | 2500 | GRAVITY_OIL | 43 | MCF_GAS | 262 | TUBING_PRESS | 1500 |
| Perforation Data: | Interval Top: | 8134 ft. | # Of Holes: | 288 | Interval Bottom: | 12821 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 5/22/2019 Interval Top: 8134 ft. Interval Bottom: 9434 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/22/2019 | Treatment End Date: | N/A | Treatment Summary: | 8134-9434 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8134 ft. | # Of Holes: | 288 | Interval Bottom: | 9434 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3441 |
Total Gas Produced (MCF) | 62808 |
GOR | 18252 |
GOR Determination | MCFE |
Average BOE per Day | 38.964 |
Average MCFE per Day | 226.006 |
Federal Financial Assurance | i | |
|
|