|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2023 Measured TD: 13094 ft. Vertical TD: 7472 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/17/2019 | Proposed Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 124 FSL 1093 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 474 FNL 1128 FEL | Proposed Depth/Form: | 13059 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13049 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1530, Top: , Bottom: 13049 ft. |
| | |
Wellbore Completed | Completion Date: | 4/19/2018 | Spud Date: | 2/10/2018 | Spud Date Is: | ACTUAL | Measured TD: | 13094 ft. | Measured PB depth: | 13079 ft. | True Vertical TD: | 7472 ft. | True Vertical PB depth: | 7473 ft. | Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 124 FSL 1093 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 474 N 1128 E | Log Types: | GR\LWD, CBL, CNL RUN ON THE AZUL 13-14HZ WELL (API: 05-123-46107). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1901 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 676, Top: 0 ft., Bottom: 1901 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13088 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1170, Top: 1740 ft., Bottom: 13094 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1650 ft. | | | | PARKMAN | 4534 ft. | | | | SUSSEX | 4931 ft. | | | | SHARON SPRINGS | 7562 ft. | | | | NIOBRARA | 7589 ft. | | | | FORT HAYS | 8149 ft. | | | | CODELL | 8239 ft. | | | | CARLILE | 8337 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 5/22/2019 Interval Top: 9596 ft. Interval Bottom: 11850 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/22/2019 | Treatment End Date: | N/A | Treatment Summary: | 9596-10284, 10565-10750, 11671-11850 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 9596 ft. | # Of Holes: | 288 | Interval Bottom: | 11850 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/22/2019 Interval Top: 8594 ft. Interval Bottom: 13059 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/22/2019 | Treatment End Date: | N/A | Treatment Summary: | 8594-9596, 10284-10565, 10750-11671, 11850-13059 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8594 ft. | # Of Holes: | 288 | Interval Bottom: | 13059 ft. | Hole Size: | 0.44 in. |
|
Formation CARL Formation Classification: OW Status: CM - 5/22/2019 Interval Top: 8358 ft. Interval Bottom: 8594 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/22/2019 | Treatment End Date: | N/A | Treatment Summary: | 8358-8594 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8358 ft. | # Of Holes: | 288 | Interval Bottom: | 8594 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 3/1/2023 Interval Top: 8358 ft. Interval Bottom: 13059 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 4/11/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/12/2019 | Treatment End Date: | N/A | Treatment Summary: | PERF AND FRAC FROM 8358-13059.
142 BBL 15% HCL ACID, 3,478 BBL PUMP DOWN, 102,552 BBL SLICKWATER, 106172 TOTAL FLUID, 2,603,656# 40/70 OTTAWA/ST. PETERS, 2,603,656# TOTAL SAND. | Total fluid used in treatment (bbls): | 106172 | Max pressure during treatment (psi): | 7764 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 142 | Min frac gradient (psi/ft): | 0.88 | Recycled water used in treatment (bbls): | 750 | Total flowback volume recovered (bbls): | 13368 | Fresh water used in treatment (bbls): | 105280 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2603656 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7899 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/12/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 206 | BBLS_OIL | 132 | BTU_GAS | 1280 | CALC_BBLS_H2O | 206 | CALC_BBLS_OIL | 132 | CALC_GOR | 1068 | CALC_MCF_GAS | 141 | CASING_PRESS | 1866 | GRAVITY_OIL | 43 | MCF_GAS | 141 | TUBING_PRESS | 1420 |
| Perforation Data: | Interval Top: | 8358 ft. | # Of Holes: | 288 | Interval Bottom: | 13059 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2716 |
Total Gas Produced (MCF) | 69986 |
GOR | 25768 |
GOR Determination | MCFE |
Average BOE per Day | 40.382 |
Average MCFE per Day | 234.194 |
Federal Financial Assurance | i | |
|
|