Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46042
Well Classification: OW Status: PR - 7/4/2018
Well Name/No:Postle IC #09-379HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/4/2018
FacilityID:453348LocationID:433857
County:WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1570FNL  520 FWLLat/Long: 40.243663 / -104.977921Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243662 / -104.977919Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/17/2018
End Date: 6/3/2018
Reported: 6/13/2018
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/4/2018             Measured TD: 18938 ft.    Vertical TD: 7224 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/4/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/10/2019
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 509 FSL  202 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 515 FSL  415 FWL
Proposed Depth/Form:19111 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19087 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2442, Top: , Bottom: 19087 ft.

Wellbore Completed
Completion Date:2/21/2018
Spud Date:1/10/2018Spud Date Is:ACTUAL
Measured TD:18938 ft.Measured PB depth:18930 ft.
True Vertical TD:7224 ft.True Vertical PB depth:7225 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 509 FSL  202 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 515 FSL  415 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1529 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 672, Top: 0 ft., Bottom: 1529 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18938 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3242, Top: 1374 ft., Bottom: 18938 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3883 ft.4176 ft.NN
SUSSEX4452 ft.4612 ft.NN
SHANNON5055 ft.5157 ft.NN
SHARON SPRINGS7721 ft.NN
NIOBRARA7890 ft.NN
FORT HAYS8435 ft.NN
CODELL8815 ft.NN
CARLILE14299 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/30/2020                 Interval Top: 16885 ft.    Interval Bottom: 17569 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/26/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/30/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 16885 - 17569
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:16885 ft.# Of Holes:1560
Interval Bottom:17569 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 6/30/2020                 Interval Top: 14299 ft.    Interval Bottom: 18252 ft.

 Completed Information for Formation CARLILE
1st Production Date:6/26/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/30/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Inervals: 14299 - 15481, 18125 - 18252
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:14299 ft.# Of Holes:1560
Interval Bottom:18252 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/30/2020                 Interval Top: 8780 ft.    Interval Bottom: 18838 ft.

 Completed Information for Formation CODELL
1st Production Date:6/26/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/30/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8780 - 12562, 12700 - 14298, 15482 - 16750, 17730 - 18124, 18253 - 18838
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8780 ft.# Of Holes:1560
Interval Bottom:18838 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/30/2020                 Interval Top: 8584 ft.    Interval Bottom: 17729 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:6/26/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/30/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 8584 - 8779, 12563 - 12699, 16751 - 16884, 17570 - 17729
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8584 ft.# Of Holes:1560
Interval Bottom:17729 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 7/4/2018                  Interval Top: 8584 ft.    Interval Bottom: 18838 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:6/26/2018Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/17/2018Treatment End Date:6/3/2018
Treatment Summary:626,257 lbs 100 Mesh Sand; 9,806,591 lbs 20/40 Sand; 183,005 bbls Gelled Fluid. Flowback determined from well test separator.
Total fluid used in treatment (bbls):183005Max pressure during treatment (psi):4802
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):24221
Fresh water used in treatment (bbls):183005Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10432848Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8144 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/4/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 532
BBLS_OIL 421
BTU_GAS 1272
CALC_BBLS_H2O 532
CALC_BBLS_OIL 421
CALC_GOR 624
CALC_MCF_GAS 263
CASING_PRESS 2269
GRAVITY_OIL 44
MCF_GAS 263
TUBING_PRESS 1512
Perforation Data:
Interval Top:8584 ft.# Of Holes:1560
Interval Bottom:18838 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5473
Total Gas Produced (MCF)104454
GOR19085
GOR DeterminationMCFE
Average BOE per Day64.368
Average MCFE per Day373.321

 Federal Financial Assurance  i 

 Tribal Well  i No