Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46038
Well Classification: OW Status: PR - 1/1/2021
Well Name/No:Postle IC #09-259HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2021
FacilityID:453344LocationID:433857
County:WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1566FNL  624 FWLLat/Long: 40.243675 / -104.977545Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243674 / -104.977546Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2018
End Date: 5/16/2018
Reported: 6/11/2018
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2021             Measured TD: 18370 ft.    Vertical TD: 7010 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/10/2019
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1890 FSL  337 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1895 FSL  414 FWL
Proposed Depth/Form:18358 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18358 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2365, Top: , Bottom: 18358 ft.

Wellbore Completed
Completion Date:3/17/2018
Spud Date:1/3/2018Spud Date Is:ACTUAL
Measured TD:18370 ft.Measured PB depth:18362 ft.
True Vertical TD:7010 ft.True Vertical PB depth:7010 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1890 FSL  337 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1895 FSL  414 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1525 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 672, Top: 0 ft., Bottom: 1525 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18370 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3128, Top: 700 ft., Bottom: 18370 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3644 ft.3903 ft.NN
SUSSEX4131 ft.4244 ft.NN
SHANNON4706 ft.4809 ft.NN
SHARON SPRINGS7351 ft.NN
NIOBRARA7557 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2021                  Interval Top: 7886 ft.    Interval Bottom: 18280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/20/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/22/2018Treatment End Date:5/16/2018
Treatment Summary:853,899# 100 Mesh Sand; 9,670,822# 20/40 Sand; 2,656 bbls 15% HCL Acid, 248,825 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):251481Max pressure during treatment (psi):4469
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:70
Total acid used in treatment (bbls):2656Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29372
Fresh water used in treatment (bbls):248825Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10524721Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7647 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/29/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 883
BBLS_OIL 324
BTU_GAS 1272
CALC_BBLS_H2O 883
CALC_BBLS_OIL 324
CALC_GOR 1009
CALC_MCF_GAS 327
CASING_PRESS 2500
GRAVITY_OIL 44
MCF_GAS 327
TUBING_PRESS 1850
Perforation Data:
Interval Top:7886 ft.# Of Holes:1820
Interval Bottom:18280 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3595
Total Gas Produced (MCF)109679
GOR30508
GOR DeterminationMCFE
Average BOE per Day61.705
Average MCFE per Day357.895

 Federal Financial Assurance  i 

 Tribal Well  i No