Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45995
Well Classification: OW Status: PR - 10/24/2019
Well Name/No:Coyote Trails #33S-20-5C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/24/2019
FacilityID:453235LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5270 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1148FSL  2229 FELLat/Long: 40.017976 / -105.007024Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017978 / -105.007024Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2019
End Date: 8/14/2019
Reported: 9/26/2019
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/24/2019             Measured TD: 18206 ft.    Vertical TD: 8181 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/24/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 506 FNL  1551 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68W Footage: 152 FSL  1992 FEL
Proposed Depth/Form:18185 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18185 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2431, Top: 1500 ft., Bottom: 18185 ft.

Wellbore Completed
Completion Date:2/28/2019
Spud Date:2/5/2019Spud Date Is:ACTUAL
Measured TD:18206 ft.Measured PB depth:18191 ft.
True Vertical TD:8181 ft.True Vertical PB depth:8180 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 506 FNL  1551 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68WFootage: 152 FSL  1992 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1605 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1605 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18196 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2950, Top: 160 ft., Bottom: 18206 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4587 ft.NN
SUSSEX4957 ft.NN
SHANNON5417 ft.NN
SHARON SPRINGS7809 ft.NN
NIOBRARA7824 ft.NN
FORT HAYS8392 ft.NN
CODELL8534 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/13/2019                Interval Top: 9691 ft.    Interval Bottom: 14662 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/14/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2019Treatment End Date:8/14/2019
Treatment Summary:Perforated Intervals: 9691'-9891'; 14563'-14662'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9691 ft.# Of Holes:54
Interval Bottom:14662 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/13/2019                Interval Top: 9511 ft.    Interval Bottom: 9669 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2019Treatment End Date:8/14/2019
Treatment Summary:Perforated Interval: 9511'-9669'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9511 ft.# Of Holes:21
Interval Bottom:9669 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/13/2019                Interval Top: 8640 ft.    Interval Bottom: 18182 ft.

 Completed Information for Formation CODELL
1st Production Date:10/14/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2019Treatment End Date:8/14/2019
Treatment Summary:Perforated Intervals: 8640'-9487'; 9927'-14528'; 14683'-18182'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8640 ft.# Of Holes:1036
Interval Bottom:18182 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 10/24/2019                Interval Top: 8640 ft.    Interval Bottom: 18182 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2019Treatment End Date:8/14/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell with 38-stage plug-and-perf; 139934 total bbls fluid pumped: 125926 bbls gelled fluid and 14008 bbls fresh water; 7125050 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):139934Max pressure during treatment (psi):8544
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8976
Fresh water used in treatment (bbls):14008Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7125050Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8421 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 138
BBLS_OIL 478
BTU_GAS 1300
CALC_BBLS_H2O 138
CALC_BBLS_OIL 478
CALC_GOR 3209
CALC_MCF_GAS 1534
CASING_PRESS 2358
GRAVITY_OIL 49
MCF_GAS 1534
TUBING_PRESS 1666
Perforation Data:
Interval Top:8640 ft.# Of Holes:1111
Interval Bottom:18182 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5052
Total Gas Produced (MCF)135286
GOR26778
GOR DeterminationMCFE
Average BOE per Day77.777
Average MCFE per Day451.113

 Federal Financial Assurance  i 

 Tribal Well  i No