Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45993
Well Classification: OW Status: PR - 9/8/2018
Well Name/No:Coyote Trails #34S-20-13N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/8/2018
FacilityID:453233LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5272 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1145FSL  2085 FELLat/Long: 40.017974 / -105.006510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017974 / -105.006510Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/25/2018
End Date: 6/13/2018
Reported: 6/25/2018
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/8/2018             Measured TD: 19032 ft.    Vertical TD: 8001 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/8/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Proposed Top PZ Location:Sec:34 Twp: 1N 68W Footage: 466 FNL  1287 FWL
Bottom Hole Location:Sec:3 Twp: 1S 68W Footage: 191 FSL  862 FWL
Proposed Depth/Form:18834 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18834 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2526, Top: 1500 ft., Bottom: 18834 ft.

Wellbore Completed
Completion Date:3/6/2018
Spud Date:2/5/2018Spud Date Is:ACTUAL
Measured TD:19032 ft.Measured PB depth:19017 ft.
True Vertical TD:8001 ft.True Vertical PB depth:8001 ft.
Top PZ Location:Sec:34 Twp: 1N 68WFootage: 466 FNL  1287 FWL
Bottom Hole Location:Sec:3 Twp: 1S 68WFootage: 191 FSL  862 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1623 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 1623 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19017 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2990, Top: 467 ft., Bottom: 19017 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5242 ft.NN
SUSSEX5660 ft.NN
SHANNON6205 ft.NN
SHARON SPRINGS8649 ft.NN
NIOBRARA8699 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/8/2018                  Interval Top: 9407 ft.    Interval Bottom: 18916 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/22/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/13/2018
Treatment Summary:Frac'd Niobrara with 49-stage plug-and-perf; 9800110 total lbs proppant pumped: 4900060 lbs 40/70 mesh and 4900050 lbs 30/50 mesh; 19807 total bbls fluid pumped: 19350 bbls fresh water and 457 bbls 15% HCL acid.
Total fluid used in treatment (bbls):19807Max pressure during treatment (psi):8575
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):457Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12056
Fresh water used in treatment (bbls):19350Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9800110Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9368 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/8/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 614
BBLS_OIL 668
BTU_GAS 1200
CALC_BBLS_H2O 614
CALC_BBLS_OIL 668
CALC_GOR 2298
CALC_MCF_GAS 1535
CASING_PRESS 2359
GRAVITY_OIL 50
MCF_GAS 1535
TUBING_PRESS 1692
Perforation Data:
Interval Top:9407 ft.# Of Holes:1537
Interval Bottom:18916 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2977
Total Gas Produced (MCF)87252
GOR29308
GOR DeterminationMCFE
Average BOE per Day49.371
Average MCFE per Day286.345

 Federal Financial Assurance  i 

 Tribal Well  i No