Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45990
Well Classification: OW Status: PR - 6/1/2019
Well Name/No:Coyote Trails #34S-20-16N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2019
FacilityID:453230LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5274 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1144FSL  2031 FELLat/Long: 40.017973 / -105.006317Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017972 / -105.006318Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/25/2018
End Date: 6/5/2018
Reported: 6/25/2018
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2019             Measured TD: 19307 ft.    Vertical TD: 7773 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Proposed Top PZ Location:Sec:34 Twp: 1N 68W Footage: 475 FNL  2415 FWL
Bottom Hole Location:Sec:3 Twp: 1S 68W Footage: 197 FSL  1992 FWL
Proposed Depth/Form:19416 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19416 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2611, Top: 1500 ft., Bottom: 19416 ft.

Wellbore Completed
Completion Date:3/26/2018
Spud Date:2/3/2018Spud Date Is:ACTUAL
Measured TD:19307 ft.Measured PB depth:19297 ft.
True Vertical TD:7773 ft.True Vertical PB depth:7773 ft.
Top PZ Location:Sec:34 Twp: 1N 68WFootage: 475 FNL  2415 FWL
Bottom Hole Location:Sec:3 Twp: 1S 68WFootage: 197 FSL  1992 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 1620 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19297 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3075, Top: 1190 ft., Bottom: 19297 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5689 ft.NN
SUSSEX6182 ft.NN
SHANNON6798 ft.NN
SHARON SPRINGS9362 ft.NN
NIOBRARA9447 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2019                  Interval Top: 9685 ft.    Interval Bottom: 19194 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/20/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/24/2018Treatment End Date:6/5/2018
Treatment Summary:Frac'd Niobrara with 49-stage plug-and-perf; 14700320 total lbs proppant pumped: 7340020 lbs 40/70 mesh and 7360300 lbs 30/50 mesh; 22947 total bbls fluid pumped: 22447 bbls fresh water and 500 bbls 15% HCL acid.
Total fluid used in treatment (bbls):22947Max pressure during treatment (psi):8891
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):500Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13940
Fresh water used in treatment (bbls):22447Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14700320Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9640 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/6/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 283
BBLS_OIL 643
BTU_GAS 1530
CALC_BBLS_H2O 283
CALC_BBLS_OIL 643
CALC_GOR 1876
CALC_MCF_GAS 1206
CASING_PRESS 2117
GRAVITY_OIL 46
MCF_GAS 1206
TUBING_PRESS 1599
Perforation Data:
Interval Top:9685 ft.# Of Holes:1533
Interval Bottom:19194 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3768
Total Gas Produced (MCF)82055
GOR21776
GOR DeterminationMCFE
Average BOE per Day49.062
Average MCFE per Day284.535

 Federal Financial Assurance  i 

 Tribal Well  i No