Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45988
Well Classification: OW Status: PR - 2/1/2023
Well Name/No:Coyote Trails #33S-20-3N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:453228LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5272 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1148FSL  2265 FELLat/Long: 40.017976 / -105.007153Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017980 / -105.007151Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/28/2019
End Date: 8/6/2019
Reported: 9/26/2019
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2023             Measured TD: 17877 ft.    Vertical TD: 7937 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 504 FNL  2069 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68W Footage: 184 FSL  2599 FEL
Proposed Depth/Form:17877 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17877 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2386, Top: 1500 ft., Bottom: 17877 ft.

Wellbore Completed
Completion Date:2/21/2019
Spud Date:2/4/2019Spud Date Is:ACTUAL
Measured TD:17877 ft.Measured PB depth:17853 ft.
True Vertical TD:7937 ft.True Vertical PB depth:7937 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 504 FNL  2069 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68WFootage: 184 FSL  2599 FEL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 1600 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17867 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2900, Top: 157 ft., Bottom: 17877 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4571 ft.NN
SUSSEX4916 ft.NN
SHANNON5351 ft.NN
SHARON SPRINGS7841 ft.NN
NIOBRARA7868 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2023                  Interval Top: 8325 ft.    Interval Bottom: 17853 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/28/2019Treatment End Date:8/6/2019
Treatment Summary:Frac'd Niobrara with 48-stage plug-and-perf; 226281 total bbls fluid pumped: 209289 bbls gelled fluid and 16992 bbls fresh water; 9599950 total lbs proppant pumped: 4800005 lbs 40/70 mesh and 4799945 lbs 30/50 mesh.
Total fluid used in treatment (bbls):226281Max pressure during treatment (psi):8424
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9443
Fresh water used in treatment (bbls):16992Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9599950Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8274 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 203
BBLS_OIL 642
BTU_GAS 1300
CALC_BBLS_H2O 203
CALC_BBLS_OIL 642
CALC_GOR 3031
CALC_MCF_GAS 1946
CASING_PRESS 2444
GRAVITY_OIL 49
MCF_GAS 1946
TUBING_PRESS 1848
Perforation Data:
Interval Top:8325 ft.# Of Holes:1129
Interval Bottom:17853 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4320
Total Gas Produced (MCF)102330
GOR23687
GOR DeterminationMCFE
Average BOE per Day60.143
Average MCFE per Day348.841

 Federal Financial Assurance  i 

 Tribal Well  i No