Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45986
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:Coyote Trails #34S-20-8C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:453226LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5270 ft.
Planned Location:1147FSL  2175 FELLat/Long: 40.017975 / -105.006831Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017977 / -105.006835Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/26/2018
End Date: 5/11/2018
Reported: 5/21/2018
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 18076 ft.    Vertical TD: 7830 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Prop Depth/Form:18343 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18343 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2454, Top: 1500 ft., Bottom: 18343 ft.

Wellbore Completed
Completion Date:4/11/2018
Spud Date:3/28/2018Spud Date Is:ACTUAL
Measured TD:18076 ft.Measured PB depth:18057 ft.
True Vertical TD:7830 ft.True Vertical PB depth:7831 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 488 FNL  595 FELDepth
Bottom Hole Location:Sec:4 Twp: 1S 68WFootage: 181 FSL  1045 FELDepth
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1600 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18057 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2850, Top: 1522 ft., Bottom: 18057 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4732 ft.NN
SUSSEX5120 ft.NN
SHANNON5802 ft.NN
SHARON SPRINGS8048 ft.NN
NIOBRARA8211 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2023                  Interval Top: 8469 ft.    Interval Bottom: 17955 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/26/2018Treatment End Date:5/11/2018
Treatment Summary:Frac'd Niobrara with 49-stage plug-and-perf; 9004620 total lbs proppant pumped: 4938020 lbs 40/70 mesh, 4062550 lbs 30/50 mesh, and 4050 lbs 100 mesh; 18165 total bbls fluid pumped: 17659 bbls fresh water and 506 bbls 15% HCL acid.
Total fluid used in treatment (bbls):18165Max pressure during treatment (psi):8624
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):506Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14091
Fresh water used in treatment (bbls):17659Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9004620Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/6/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 592
BBLS_OIL 636
BTU_GAS 1200
CALC_BBLS_H2O 592
CALC_BBLS_OIL 636
CALC_GOR 2602
CALC_MCF_GAS 1655
CASING_PRESS 2248
GRAVITY_OIL 50
MCF_GAS 1655
TUBING_PRESS 1775
Perforation Data:
Interval Top:8469 ft.# Of Holes:1537
Interval Bottom:17955 ft.Hole Size:0.52 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)5741
Total Gas Produced (MCF)137152
GOR23889
GOR DeterminationMCFE
Average BOE per Day80.250
Average MCFE per Day465.461

 Federal Financial Assurance  i 

 Tribal Well  i No