Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45986
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:Coyote Trails #34S-20-8C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:453226LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5270 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1147FSL  2175 FELLat/Long: 40.017975 / -105.006831Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017977 / -105.006835Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/26/2018
End Date: 5/11/2018
Reported: 5/21/2018
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 18076 ft.    Vertical TD: 7830 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 488 FNL  595 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68W Footage: 181 FSL  1045 FEL
Proposed Depth/Form:18343 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18343 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2454, Top: 1500 ft., Bottom: 18343 ft.

Wellbore Completed
Completion Date:4/11/2018
Spud Date:3/28/2018Spud Date Is:ACTUAL
Measured TD:18076 ft.Measured PB depth:18057 ft.
True Vertical TD:7830 ft.True Vertical PB depth:7831 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 488 FNL  595 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68WFootage: 181 FSL  1045 FEL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1600 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18057 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2850, Top: 1522 ft., Bottom: 18057 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4732 ft.NN
SUSSEX5120 ft.NN
SHANNON5802 ft.NN
SHARON SPRINGS8048 ft.NN
NIOBRARA8211 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2023                  Interval Top: 8469 ft.    Interval Bottom: 17955 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/26/2018Treatment End Date:5/11/2018
Treatment Summary:Frac'd Niobrara with 49-stage plug-and-perf; 9004620 total lbs proppant pumped: 4938020 lbs 40/70 mesh, 4062550 lbs 30/50 mesh, and 4050 lbs 100 mesh; 18165 total bbls fluid pumped: 17659 bbls fresh water and 506 bbls 15% HCL acid.
Total fluid used in treatment (bbls):18165Max pressure during treatment (psi):8624
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):506Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14091
Fresh water used in treatment (bbls):17659Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9004620Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/6/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 592
BBLS_OIL 636
BTU_GAS 1200
CALC_BBLS_H2O 592
CALC_BBLS_OIL 636
CALC_GOR 2602
CALC_MCF_GAS 1655
CASING_PRESS 2248
GRAVITY_OIL 50
MCF_GAS 1655
TUBING_PRESS 1775
Perforation Data:
Interval Top:8469 ft.# Of Holes:1537
Interval Bottom:17955 ft.Hole Size:0.52 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4460
Total Gas Produced (MCF)131987
GOR29593
GOR DeterminationMCFE
Average BOE per Day74.597
Average MCFE per Day432.652

 Federal Financial Assurance  i 

 Tribal Well  i No