Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45830
Well Classification: OW Status: PR - 4/1/2021
Well Name/No:File #3A-32H-K268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2021
FacilityID:452934LocationID:434248
Municipality/County:FREDERICK / WELD #123Location:NESW 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Planned Location:1760FSL  1592 FWLLat/Long: 40.092576 / -105.031218Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.092576 / -105.031218Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/15/2018
End Date: 3/25/2018
Reported: 4/13/2018
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2021             Measured TD: 14664 ft.    Vertical TD: 7726 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/6/2019
Prop Depth/Form:14653 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1900 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 815, Top: 0 ft., Bottom: 1900 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14653 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2083, Top: 0 ft., Bottom: 14653 ft.

Wellbore Completed
Completion Date:11/29/2017
Spud Date:11/15/2017Spud Date Is:ACTUAL
Measured TD:14664 ft.Measured PB depth:14611 ft.
True Vertical TD:7726 ft.True Vertical PB depth:7728 ft.
Top PZ Location:Sec:31 Twp: 2N 68WFootage: 1733 FSL  58 FELDepth
Bottom Hole Location:Sec:5 Twp: 1N 68WFootage: 468 FSL  85 FWLDepth
Log Types:Mud Log, MWD/LWD, CBL, (Pulsed Neutron in 123-38072)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 121 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1896 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 726, Top: 0 ft., Bottom: 1896 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 14644 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2260, Top: 2536 ft., Bottom: 14664 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4382 ft.
SHANNON5018 ft.
SHARON SPRINGS7395 ft.
NIOBRARA7498 ft.
FORT HAYS7994 ft.
CODELL8895 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/17/2019                 Interval Top: 8896 ft.    Interval Bottom: 14378 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/17/2019Treatment End Date:N/A
Treatment Summary:Perfs at: 8896-10184; 10535-11860; 12051-13264; 13576-14378
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8896 ft.# Of Holes:1129
Interval Bottom:14378 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 4/1/2021                  Interval Top: 8014 ft.    Interval Bottom: 14596 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:9/1/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/15/2018Treatment End Date:3/25/2018
Treatment Summary:48 stages with zonal isolation in the Codell SS. A total of 180,555 bbl fresh water, 97 bbl FRP-4K, 3,950,180 lbs of 40/70 mesh proppand (sand) were pumped at an average rate of 88 bbls/min down 5.5" casing for a average treating pressure (ATP) of 7194 psi.
Total fluid used in treatment (bbls):180652Max pressure during treatment (psi):8648
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5764
Fresh water used in treatment (bbls):180652Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3950180Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7834 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2018Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 90
BBLS_OIL 527
BTU_GAS 1241
CALC_BBLS_H2O 90
CALC_BBLS_OIL 527
CALC_GOR 1685
CALC_MCF_GAS 888
CASING_PRESS 2558
GRAVITY_OIL 47
MCF_GAS 888
TUBING_PRESS 1989
Perforation Data:
Interval Top:8014 ft.# Of Holes:1129
Interval Bottom:14596 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/17/2019                 Interval Top: 8014 ft.    Interval Bottom: 14596 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/17/2019Treatment End Date:N/A
Treatment Summary:Perfs at: 8014-8895; 10185-10534; 11861-12050; 13298-13542; 14549-14596
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8014 ft.# Of Holes:1129
Interval Bottom:14596 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)15119
Total Gas Produced (MCF)203909
GOR13486
GOR DeterminationBOE
Average BOE per Day137.397
Average MCFE per Day796.899

 Federal Financial Assurance  i 

 Tribal Well  i No