Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45830
Well Classification: OW Status: PR - 4/1/2021
Well Name/No:File #3A-32H-K268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2021
FacilityID:452934LocationID:434248
Municipality/County:FREDERICK / WELD #123Location:NESW 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1760FSL  1592 FWLLat/Long: 40.092576 / -105.031218Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.092576 / -105.031218Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/15/2018
End Date: 3/25/2018
Reported: 4/13/2018
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2021             Measured TD: 14664 ft.    Vertical TD: 7726 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/6/2019
Proposed Top PZ Location:Sec:31 Twp: 2N 68W Footage: 1733 FSL  58 FEL
Bottom Hole Location:Sec:5 Twp: 1N 68W Footage: 468 FSL  85 FWL
Proposed Depth/Form:14653 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1900 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 815, Top: 0 ft., Bottom: 1900 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14653 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2083, Top: 0 ft., Bottom: 14653 ft.

Wellbore Completed
Completion Date:11/29/2017
Spud Date:11/15/2017Spud Date Is:ACTUAL
Measured TD:14664 ft.Measured PB depth:14611 ft.
True Vertical TD:7726 ft.True Vertical PB depth:7728 ft.
Top PZ Location:Sec:31 Twp: 2N 68WFootage: 1733 FSL  58 FEL
Bottom Hole Location:Sec:5 Twp: 1N 68WFootage: 468 FSL  85 FWL
Log Types:Mud Log, MWD/LWD, CBL, (Pulsed Neutron in 123-38072)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 121 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1896 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 726, Top: 0 ft., Bottom: 1896 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 14644 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2260, Top: 2536 ft., Bottom: 14664 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4382 ft.
SHANNON5018 ft.
SHARON SPRINGS7395 ft.
NIOBRARA7498 ft.
FORT HAYS7994 ft.
CODELL8895 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/17/2019                 Interval Top: 8896 ft.    Interval Bottom: 14378 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/17/2019Treatment End Date:N/A
Treatment Summary:Perfs at: 8896-10184; 10535-11860; 12051-13264; 13576-14378
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8896 ft.# Of Holes:1129
Interval Bottom:14378 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 4/1/2021                  Interval Top: 8014 ft.    Interval Bottom: 14596 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:9/1/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/15/2018Treatment End Date:3/25/2018
Treatment Summary:48 stages with zonal isolation in the Codell SS. A total of 180,555 bbl fresh water, 97 bbl FRP-4K, 3,950,180 lbs of 40/70 mesh proppand (sand) were pumped at an average rate of 88 bbls/min down 5.5" casing for a average treating pressure (ATP) of 7194 psi.
Total fluid used in treatment (bbls):180652Max pressure during treatment (psi):8648
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5764
Fresh water used in treatment (bbls):180652Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3950180Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7834 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2018Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 90
BBLS_OIL 527
BTU_GAS 1241
CALC_BBLS_H2O 90
CALC_BBLS_OIL 527
CALC_GOR 1685
CALC_MCF_GAS 888
CASING_PRESS 2558
GRAVITY_OIL 47
MCF_GAS 888
TUBING_PRESS 1989
Perforation Data:
Interval Top:8014 ft.# Of Holes:1129
Interval Bottom:14596 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/17/2019                 Interval Top: 8014 ft.    Interval Bottom: 14596 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/17/2019Treatment End Date:N/A
Treatment Summary:Perfs at: 8014-8895; 10185-10534; 11861-12050; 13298-13542; 14549-14596
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8014 ft.# Of Holes:1129
Interval Bottom:14596 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)9961
Total Gas Produced (MCF)123462
GOR12394
GOR DeterminationBOE
Average BOE per Day85.694
Average MCFE per Day497.053

 Federal Financial Assurance  i 

 Tribal Well  i No