Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45507
Well Classification: OW Status: PR - 5/12/2021
Well Name/No:PAPA JO 2-25 #35C2-17HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/12/2021
FacilityID:452273LocationID:452217
County:WELD #123Location:NWSW 8 1N68W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:5064 ft.
Planned Location:1403FSL  1339 FWLLat/Long: 40.062069 / -105.032551Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.062068 / -105.032553Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/17/2021
End Date: 3/21/2021
Reported: 5/17/2021
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/12/2021             Measured TD: 13495 ft.    Vertical TD: 7838 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/12/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/20/2019
Prop Depth/Form:13463 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13453 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1579, Top: , Bottom: 13453 ft.

Wellbore Completed
Completion Date:1/18/2018
Spud Date:11/22/2017Spud Date Is:ACTUAL
Measured TD:13495 ft.Measured PB depth:13479 ft.
True Vertical TD:7838 ft.True Vertical PB depth:7839 ft.
Top PZ Location:Sec:17 Twp: 1N 68WFootage: 181 FNL  1723 FWLDepth
Bottom Hole Location:Sec:17 Twp: 1N 68WFootage: 54 FSL  1696 FWLDepth
Log Types:GR, CBL, CNL RUN ON THE PAPA JO 2-25 35C-17HZ WELL (API: 05-123-45502).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1871 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1880 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13487 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1323, Top: 1150 ft., Bottom: 13495 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4295 ft.
SUSSEX4672 ft.
SHANNON5263 ft.
SHARON SPRINGS7580 ft.
NIOBRARA7638 ft.
FORT HAYS8279 ft.
CODELL8358 ft.
CARLILE8812 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/10/2021                Interval Top: 10526 ft.    Interval Bottom: 10819 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:10526-10819
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10526 ft.# Of Holes:312
Interval Bottom:10819 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/10/2021                Interval Top: 10423 ft.    Interval Bottom: 10526 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:10423-10526
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10423 ft.# Of Holes:312
Interval Bottom:10526 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/10/2021                Interval Top: 9226 ft.    Interval Bottom: 9253 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:9226-9253
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9226 ft.# Of Holes:312
Interval Bottom:9253 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/10/2021                Interval Top: 8439 ft.    Interval Bottom: 13461 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/10/2021Treatment End Date:N/A
Treatment Summary:8439-9226, 9253-10423, 10819-13461
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8439 ft.# Of Holes:312
Interval Bottom:13461 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/12/2021                 Interval Top: 8439 ft.    Interval Bottom: 13461 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/20/2021Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/17/2021Treatment End Date:3/21/2021
Treatment Summary:PERF FROM 8439-13461 2,650 BBLS PUMP DOWN; 125,620 BBLS SLICKWATER; 128,270 BBLS TOTAL FLUID. 2,001,000 LBS WHITE 30/50 OTTAWA/ST. PETERS; 778,326 LBS WHITE 40/70 OTTAWA/ST. PETERS; 2,779,326 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):128270Max pressure during treatment (psi):7676
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):128270Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2779326Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7862 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 172
BBLS_OIL 110
BTU_GAS 1258
CALC_BBLS_H2O 172
CALC_BBLS_OIL 110
CALC_GOR 3182
CALC_MCF_GAS 350
CASING_PRESS 2600
GRAVITY_OIL 49
MCF_GAS 350
TUBING_PRESS 2000
Perforation Data:
Interval Top:8439 ft.# Of Holes:312
Interval Bottom:13461 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)9515
Total Gas Produced (MCF)75517
GOR7936
GOR DeterminationBOE
Average BOE per Day61.583
Average MCFE per Day357.185

 Federal Financial Assurance  i 

 Tribal Well  i No