|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/12/2021 Measured TD: 13495 ft. Vertical TD: 7838 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/12/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/20/2019 | | Proposed Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 50 FNL 1646 FWL | | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 53 FSL 1689 FWL | | Proposed Depth/Form: | 13463 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13453 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1579, Top: , Bottom: 13453 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/18/2018 | | Spud Date: | 11/22/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 13495 ft. | Measured PB depth: | 13479 ft. | | True Vertical TD: | 7838 ft. | True Vertical PB depth: | 7839 ft. | | Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 181 FNL 1723 FWL | | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 54 FSL 1696 FWL | | Log Types: | GR, CBL, CNL RUN ON THE PAPA JO 2-25 35C-17HZ WELL (API: 05-123-45502). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1871 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 1880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13487 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1323, Top: 1150 ft., Bottom: 13495 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4295 ft. | | | | | SUSSEX | 4672 ft. | | | | | SHANNON | 5263 ft. | | | | | SHARON SPRINGS | 7580 ft. | | | | | NIOBRARA | 7638 ft. | | | | | FORT HAYS | 8279 ft. | | | | | CODELL | 8358 ft. | | | | | CARLILE | 8812 ft. | | | |
Formation NBRR Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 10526 ft. Interval Bottom: 10819 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | | Treatment Summary: | 10526-10819 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 10526 ft. | # Of Holes: | 312 | | Interval Bottom: | 10819 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 10423 ft. Interval Bottom: 10526 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | | Treatment Summary: | 10423-10526 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10423 ft. | # Of Holes: | 312 | | Interval Bottom: | 10526 ft. | Hole Size: | 0.44 in. |
|
Formation CARL Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 9226 ft. Interval Bottom: 9253 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | | Treatment Summary: | 9226-9253 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 9226 ft. | # Of Holes: | 312 | | Interval Bottom: | 9253 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/10/2021 Interval Top: 8439 ft. Interval Bottom: 13461 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/10/2021 | Treatment End Date: | N/A | | Treatment Summary: | 8439-9226, 9253-10423, 10819-13461 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8439 ft. | # Of Holes: | 312 | | Interval Bottom: | 13461 ft. | Hole Size: | 0.44 in. |
|
Formation NFCC Formation Classification: OW Status: PR - 5/12/2021 Interval Top: 8439 ft. Interval Bottom: 13461 ft.| Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | | 1st Production Date: | 4/20/2021 | Choke Size: | | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 3/17/2021 | Treatment End Date: | 3/21/2021 | | Treatment Summary: | PERF FROM 8439-13461
2,650 BBLS PUMP DOWN; 125,620 BBLS SLICKWATER; 128,270 BBLS TOTAL FLUID. 2,001,000 LBS WHITE 30/50 OTTAWA/ST. PETERS; 778,326 LBS WHITE 40/70 OTTAWA/ST. PETERS; 2,779,326 LBS TOTAL PROPPANT. | | Total fluid used in treatment (bbls): | 128270 | Max pressure during treatment (psi): | 7676 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 128270 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2779326 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7862 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 172 | | BBLS_OIL | 110 | | BTU_GAS | 1258 | | CALC_BBLS_H2O | 172 | | CALC_BBLS_OIL | 110 | | CALC_GOR | 3182 | | CALC_MCF_GAS | 350 | | CASING_PRESS | 2600 | | GRAVITY_OIL | 49 | | MCF_GAS | 350 | | TUBING_PRESS | 2000 |
| | Perforation Data: | | Interval Top: | 8439 ft. | # Of Holes: | 312 | | Interval Bottom: | 13461 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 8013 |
| Total Gas Produced (MCF) | 67326 |
| GOR | 8402 |
| GOR Determination | BOE |
| Average BOE per Day | 53.606 |
| Average MCFE per Day | 310.900 |
| Federal Financial Assurance | i | |
|
|