Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45449
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Wilson IC #03-342HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:452192LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4987 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1276FNL  570 FWLLat/Long: 40.259350 / -104.958706Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259348 / -104.958707Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/2/2019
End Date: 7/21/2019
Reported: 8/9/2019
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 16302 ft.    Vertical TD: 7079 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 759 FSL  553 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 787 FSL  2291 FWL
Proposed Depth/Form:17926 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1510 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 628, Top: 0 ft., Bottom: 1510 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18026 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2297, Top: , Bottom: 18026 ft.

Wellbore Completed
Completion Date:5/5/2019
Spud Date:2/7/2019Spud Date Is:ACTUAL
Measured TD:16302 ft.Measured PB depth:16292 ft.
True Vertical TD:7079 ft.True Vertical PB depth:7079 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 759 FSL  553 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 787 FSL  2291 FWL
Log Types:Mud, MWD/LWD, CBL (Composite in 123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1587 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 0 ft., Bottom: 1587 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16302 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1760, Top: 3176 ft., Bottom: 16302 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3940 ft.4006 ft.NN
SUSSEX4510 ft.4682 ft.NN
SHANNON5118 ft.5182 ft.NN
SHARON SPRINGS7857 ft.NN
NIOBRARA8164 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 8554 ft.    Interval Bottom: 16006 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/2/2019Treatment End Date:7/21/2019
Treatment Summary:1,143 bbls 15% HCL Acid; 614,898# 100 Mesh Sand; 6,889,249# 20/40 Sand; 171,157 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):172300Max pressure during treatment (psi):7397
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:50
Total acid used in treatment (bbls):1143Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):21967
Fresh water used in treatment (bbls):171157Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7504147Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8062 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 988
BBLS_OIL 594
BTU_GAS 1393
CALC_BBLS_H2O 988
CALC_BBLS_OIL 594
CALC_GOR 1471
CALC_MCF_GAS 874
CASING_PRESS 2050
GRAVITY_OIL 46
MCF_GAS 874
TUBING_PRESS 1450
Perforation Data:
Interval Top:8554 ft.# Of Holes:1300
Interval Bottom:16006 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)3043
Total Gas Produced (MCF)99913
GOR32833
GOR DeterminationMCFE
Average BOE per Day55.470
Average MCFE per Day321.700

 Federal Financial Assurance  i 

 Tribal Well  i No