Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45446
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:Wilson IC #03-339HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:452189LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4987 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1276FNL  585 FWLLat/Long: 40.259350 / -104.958653Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259349 / -104.958654Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/2/2019
End Date: 7/21/2019
Reported: 8/9/2019
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 18400 ft.    Vertical TD: 7216 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 898 FSL  509 FEL
Bottom Hole Location:Sec:3 Twp: 3N 38W Footage: 876 FSL  239 FWL
Proposed Depth/Form:18005 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1506 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 626, Top: 0 ft., Bottom: 1506 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18105 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2305, Top: 0 ft., Bottom: 18105 ft.

Wellbore Completed
Completion Date:4/7/2019
Spud Date:2/6/2019Spud Date Is:ACTUAL
Measured TD:18400 ft.Measured PB depth:18390 ft.
True Vertical TD:7216 ft.True Vertical PB depth:7216 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 898 FSL  509 FEL
Bottom Hole Location:Sec:3 Twp: 3N 38WFootage: 876 FSL  239 FWL
Log Types:Mud, MWD/LWD, CBL (Composite in 123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1596 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 1596 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18400 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2050, Top: 5680 ft., Bottom: 18400 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3931 ft.3971 ft.NN
SUSSEX4478 ft.4653 ft.NN
SHANNON5093 ft.5139 ft.NN
SHARON SPRINGS7790 ft.NN
NIOBRARA8027 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2025                  Interval Top: 8560 ft.    Interval Bottom: 18167 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/2/2019Treatment End Date:7/21/2019
Treatment Summary:1,690 bbls 15% HCL Acid; 768,124# 100 Mesh Sand; 8,833,744# 20/40 Sand; 223,131 bbls Gelled Fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):224821Max pressure during treatment (psi):4812
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):1690Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):20412
Fresh water used in treatment (bbls):223131Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9601868Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1159
BBLS_OIL 459
BTU_GAS 1393
CALC_BBLS_H2O 1159
CALC_BBLS_OIL 459
CALC_GOR 1475
CALC_MCF_GAS 677
CASING_PRESS 2000
GRAVITY_OIL 46
MCF_GAS 677
TUBING_PRESS 1350
Perforation Data:
Interval Top:8560 ft.# Of Holes:1664
Interval Bottom:18167 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)3155
Total Gas Produced (MCF)30532
GOR9677
GOR DeterminationBOE
Average BOE per Day23.090
Average MCFE per Day133.908

 Federal Financial Assurance  i 

 Tribal Well  i No