Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45438
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Wilson IC #03-022HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:452181LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4988 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1176FNL  540 FWLLat/Long: 40.259625 / -104.958814Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259625 / -104.958813Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/28/2018
End Date: 8/10/2018
Reported: 8/20/2018
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 17399 ft.    Vertical TD: 7119 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 485 FNL  460 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 485 FNL  370 FWL
Proposed Depth/Form:17277 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17377 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2224, Top: 0 ft., Bottom: 17377 ft.

Wellbore Completed
Completion Date:7/11/2018
Spud Date:4/11/2018Spud Date Is:ACTUAL
Measured TD:17399 ft.Measured PB depth:17390 ft.
True Vertical TD:7119 ft.True Vertical PB depth:7119 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 497 FNL  544 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 500 FNL  382 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API # 05-123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1532 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 1532 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17399 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2488, Top: 1710 ft., Bottom: 17399 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3680 ft.3723 ft.NN
SUSSEX4133 ft.4288 ft.NN
SHANNON4640 ft.4668 ft.NN
SHARON SPRINGS7041 ft.NN
NIOBRARA7260 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2024                  Interval Top: 7724 ft.    Interval Bottom: 17262 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/26/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/28/2018Treatment End Date:8/10/2018
Treatment Summary:770,370 lbs 100 Mesh Sand; 8,832,268 lbs 20/40 Sand; 1,652 bbls 15% HCL Acid; 214,479 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):216131Max pressure during treatment (psi):4656
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):1652Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):21298
Fresh water used in treatment (bbls):214479Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9602638Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7290 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 276
BBLS_OIL 437
BTU_GAS 1272
CALC_BBLS_H2O 276
CALC_BBLS_OIL 437
CALC_GOR 1778
CALC_MCF_GAS 777
CASING_PRESS 2444
GRAVITY_OIL 44
MCF_GAS 777
TUBING_PRESS 1996
Perforation Data:
Interval Top:7724 ft.# Of Holes:1664
Interval Bottom:17262 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)5589
Total Gas Produced (MCF)116515
GOR20847
GOR DeterminationMCFE
Average BOE per Day70.319
Average MCFE per Day407.847

 Federal Financial Assurance  i 

 Tribal Well  i No