|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/24/2023 Measured TD: 11280 ft. Vertical TD: 6292 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/24/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/24/2025 | | Proposed Top PZ Location: | Sec:11 Twp: 4N 63W | Footage: 2050 FSL 470 FWL | | Bottom Hole Location: | Sec:11 Twp: 4N 63W | Footage: 2050 FSL 470 FEL | | Proposed Depth/Form: | 11029 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-3002 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 11: Al | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 704, Top: 0 ft., Bottom: 1700 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11029 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 942, Top: , Bottom: 11029 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/3/2022 | | Spud Date: | 9/6/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 11280 ft. | Measured PB depth: | 11246 ft. | | True Vertical TD: | 6292 ft. | True Vertical PB depth: | 6292 ft. | | Top PZ Location: | Sec:11 Twp: 4N 63W | Footage: 2041 FSL 460 FEL | | Bottom Hole Location: | Sec:11 Twp: 4N 63W | Footage: 2050 FSL 431 FEL | | Log Types: | CBL, MWD, Mud Log (GR/IND in API 05-123-45326)
| | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1762 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 0 ft., Bottom: 1772 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11260 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1506, Top: 1816 ft., Bottom: 11280 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1583 ft. | 3421 ft. | N | N | | PARKMAN | 3421 ft. | 4022 ft. | N | N | | SUSSEX | 4022 ft. | 4735 ft. | N | N | | SHANNON | 4735 ft. | 6246 ft. | N | N | | SHARON SPRINGS | 6246 ft. | 6448 ft. | N | N | | NIOBRARA | 6448 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 6/24/2023 Interval Top: 6821 ft. Interval Bottom: 11210 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/23/2023 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/10/2023 | Treatment End Date: | 5/17/2023 | | Treatment Summary: | Fractured 22 total stages, 440 holes at 0.45" diameter in the Niobrara formation from 6821' MD to 11210' MD using 4,934,720 lbs of 30/50 proppant and 1,288,680 lbs of 100 Mesh Premium for a total of 6,223,400 lbs proppant . Total fluid of 162,140 bbls, 333 bbls/15% HCI acid. Max pressure of 8,279 psi. 24 hour test for flowback. | | Total fluid used in treatment (bbls): | 162140 | Max pressure during treatment (psi): | 8279 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 22 | | Total acid used in treatment (bbls): | 333 | Min frac gradient (psi/ft): | 1.05 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 17249 | | Fresh water used in treatment (bbls): | 3992 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6223400 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6090 ft. | | Tubing Packer Depth: | 6097 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/24/2023 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 9 | | BTU_GAS | 1314 | | CALC_BBLS_H2O | 262 | | CALC_BBLS_OIL | 211 | | CALC_GOR | 834 | | CALC_MCF_GAS | 176 | | GRAVITY_OIL | 42 | | MCF_GAS | 7 | | TUBING_PRESS | 1225 |
| | Perforation Data: | | Interval Top: | 6821 ft. | # Of Holes: | 440 | | Interval Bottom: | 11210 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 12499 |
| Total Gas Produced (MCF) | 151200 |
| GOR | 12096 |
| GOR Determination | BOE |
| Average BOE per Day | 105.686 |
| Average MCFE per Day | 612.955 |
| Federal Financial Assurance | i | |
|
|