Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45236
Well Classification: OW Status: PR - 7/1/2018
Well Name/No:Hullabaloo State #Y21-763
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:70/7879-S
Facility Status:PRStatus Date7/1/2018
FacilityID:451792LocationID:451499
County:WELD #123Location:NENW 16 2N64W 6
Field:WATTENBERG - #90750Elevation:4912 ft.
Planned Location:445FNL  2580 FWLLat/Long: 40.144540 / -104.556780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.144544 / -104.556783Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/19/2018
End Date: 4/8/2018
Reported: 3/11/2019
Originally Reported: 5/24/2018
Days to report: 337
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2018             Measured TD: 17477 ft.    Vertical TD: 7129 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/17/2019
Proposed Top PZ Location:Sec:16 Twp: 2N 64W Footage: 550 FNL  1830 FWL
Bottom Hole Location:Sec:21 Twp: 2N 64W Footage: 100 FSL  1810 FWL
Proposed Depth/Form:17536 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 691, Top: 0 ft., Bottom: 1950 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17536 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2300, Top: , Bottom:

Wellbore Completed
Completion Date:10/6/2017
Spud Date:9/30/2017Spud Date Is:ACTUAL
Measured TD:17477 ft.Measured PB depth:17085 ft.
True Vertical TD:7129 ft.True Vertical PB depth:7129 ft.
Top PZ Location:Sec:16 Twp: 2N 64WFootage: 589 FNL  1784 FWL
Bottom Hole Location:Sec:21 Twp: 2N 64WFootage: 100 S  1819 W
Log Types:CBL, MUD, MWD/LWD, RESISTIVITY
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2010 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 683, Top: 0 ft., Bottom: 2010 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17135 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1934, Top: 2127 ft., Bottom: 17477 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS858 ft.
PIERRE989 ft.
PARKMAN3899 ft.
SUSSEX4268 ft.
SHANNON5078 ft.
TEEPEE BUTTES6155 ft.
SHARON SPRINGS6897 ft.
NIOBRARA6963 ft.
FORT HAYS7844 ft.
CODELL8437 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 3/13/2019                 Interval Top: 8679 ft.    Interval Bottom: 16991 ft.

 Completed Information for Formation CARLILE
1st Production Date:6/24/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2018Treatment End Date:4/8/2018
Treatment Summary:Carlile Intervals: 8678-9206, 16182-16991
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8679 ft.# Of Holes:176
Interval Bottom:16991 ft.Hole Size:0.48 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/13/2019                 Interval Top: 8135 ft.    Interval Bottom: 16159 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:6/24/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2018Treatment End Date:4/8/2018
Treatment Summary:Fort Hays Intervals: 8135-8164, 8216-8217, 8420-8445, 12914-13297, 15555-16159
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8135 ft.# Of Holes:168
Interval Bottom:16159 ft.Hole Size:0.48 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 6/29/2018                 Interval Top: 7565 ft.    Interval Bottom: 16991 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:6/24/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2018Treatment End Date:4/8/2018
Treatment Summary:Carlile Codell Fort Hays completed with 592,930 bbls slurry, 782 bbls 28% HCl, 1,321,074 lbs 100 mesh, 16,665,971 lbs 40/70 sand
Total fluid used in treatment (bbls):593712Max pressure during treatment (psi):8222
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:41
Total acid used in treatment (bbls):782Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1930
Fresh water used in treatment (bbls):592930Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17986772Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7366 ft.
Tubing Packer Depth:7371 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/29/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1263
BBLS_OIL 264
BTU_GAS 1438
CALC_BBLS_H2O 1263
CALC_BBLS_OIL 264
CALC_GOR 1159
CALC_MCF_GAS 306
CASING_PRESS 21
GRAVITY_OIL 40
MCF_GAS 306
TUBING_PRESS 1866
Perforation Data:
Interval Top:7565 ft.# Of Holes:1280
Interval Bottom:16991 ft.Hole Size:0.48 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/13/2019                 Interval Top: 7565 ft.    Interval Bottom: 15521 ft.

 Completed Information for Formation CODELL
1st Production Date:6/24/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2018Treatment End Date:4/8/2018
Treatment Summary:Codell Intervals: 7565-8108, 8192-8193, 8253-8395, 8483-8655, 9235-12885, 13320-15521
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7565 ft.# Of Holes:936
Interval Bottom:15521 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)11104
Total Gas Produced (MCF)67605
GOR6088
GOR DeterminationBOE
Average BOE per Day62.003
Average MCFE per Day359.634

 Federal Financial Assurance  i 

 Tribal Well  i No