|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2022 Measured TD: 15159 ft. Vertical TD: 7181 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/10/2019 | Proposed Top PZ Location: | Sec:26 Twp: 7N 67W | Footage: 2472 FSL 592 FEL | Bottom Hole Location: | Sec:27 Twp: 7N 67W | Footage: 2534 FSL 2562 FEL | Proposed Depth/Form: | 14829 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15102 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1983, Top: 1500 ft., Bottom: 15102 ft. |
| | |
Wellbore Completed | Completion Date: | 12/19/2017 | Spud Date: | 11/7/2017 | Spud Date Is: | ACTUAL | Measured TD: | 15159 ft. | Measured PB depth: | 15143 ft. | True Vertical TD: | 7181 ft. | True Vertical PB depth: | 7181 ft. | Top PZ Location: | Sec:26 Twp: 7N 67W | Footage: 2461 FSL 635 FEL | Bottom Hole Location: | Sec:27 Twp: 7N 67W | Footage: 2505 S 2506 E | Log Types: | CBL, Mud, MWD/LWD, Triple Combo. | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1554 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1554 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15148 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2390, Top: 76 ft., Bottom: 15148 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3780 ft. | | N | N | SUSSEX | 4406 ft. | | N | N | SHANNON | 5059 ft. | | N | N | SHARON SPRINGS | 7312 ft. | | N | N | NIOBRARA | 7349 ft. | | N | N | FORT HAYS | 7829 ft. | | N | N | CODELL | 7945 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 11/26/2018 Interval Top: 9035 ft. Interval Bottom: 9107 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 6/23/2018 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/6/2018 | Treatment End Date: | 4/20/2018 | Treatment Summary: | Producing Interval: 9035'-9107'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 9035 ft. | # Of Holes: | 16 | Interval Bottom: | 9107 ft. | Hole Size: | 0.42 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 5/1/2022 Interval Top: 7999 ft. Interval Bottom: 15098 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 6/23/2018 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/6/2018 | Treatment End Date: | 4/20/2018 | Treatment Summary: | Frac'd Codell-Fort Hays with 36-stage plug-and-perf;
12710 total bbls fluid pumped: fresh water (no acid pumped);
7199900 total lbs proppant pumped: 30/50 mesh sand. | Total fluid used in treatment (bbls): | 12710 | Max pressure during treatment (psi): | 8330 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 36 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.95 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 6140 | Fresh water used in treatment (bbls): | 12710 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 7199900 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7771 ft. | Tubing Packer Depth: | 7756 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/18/2018 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 321 | BBLS_OIL | 638 | BTU_GAS | 1300 | CALC_BBLS_H2O | 321 | CALC_BBLS_OIL | 638 | CALC_GOR | 1045 | CALC_MCF_GAS | 667 | CASING_PRESS | 41 | GRAVITY_OIL | 41 | MCF_GAS | 667 | TUBING_PRESS | 834 |
| Perforation Data: | Interval Top: | 7999 ft. | # Of Holes: | 1120 | Interval Bottom: | 15098 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/26/2018 Interval Top: 7999 ft. Interval Bottom: 15098 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/23/2018 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/6/2018 | Treatment End Date: | 4/20/2018 | Treatment Summary: | Producing Interval: 7999'-9012'; 9130'-15098'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7999 ft. | # Of Holes: | 1104 | Interval Bottom: | 15098 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5089 |
Total Gas Produced (MCF) | 19521 |
GOR | 3835 |
GOR Determination | BOE |
Average BOE per Day | 23.107 |
Average MCFE per Day | 134.015 |
Federal Financial Assurance | i | |
|
|