Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45090
Well Classification: OW Status: PR - 10/13/2018
Well Name/No:NEWBY STATE #34N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/13/2018
FacilityID:451361LocationID:449884
County:WELD #123Location:SESE 33 3N68W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:589FSL  1260 FELLat/Long: 40.176580 / -105.002859Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176580 / -105.002859Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/7/2018
End Date: 5/10/2018
Reported: 6/21/2018
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/13/2018             Measured TD: 14035 ft.    Vertical TD: 7398 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/13/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/11/2019
Proposed Top PZ Location:Sec:3 Twp: 2N 68W Footage: 52 FNL  54 FWL
Bottom Hole Location:Sec:10 Twp: 2N 68W Footage: 853 FNL  111 FWL
Proposed Depth/Form:13940 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13930 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1637, Top: , Bottom: 13930 ft.

Wellbore Completed
Completion Date:1/19/2018
Spud Date:10/29/2017Spud Date Is:ACTUAL
Measured TD:14035 ft.Measured PB depth:14023 ft.
True Vertical TD:7398 ft.True Vertical PB depth:7398 ft.
Top PZ Location:Sec:3 Twp: 2N 68WFootage: 265 FNL  26 FWL
Bottom Hole Location:Sec:10 Twp: 2N 68WFootage: 840 FNL  96 FWL
Log Types:GR, CBL, (CNL IN API 123-45091).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2336 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 0 ft., Bottom: 2336 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14025 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1850, Top: 1040 ft., Bottom: 14035 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4220 ft.
SHARON SPRINGS7260 ft.
NIOBRARA7404 ft.
FORT HAYS7875 ft.
CODELL7984 ft.
CARLILE13098 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 10/13/2018                Interval Top: 8250 ft.    Interval Bottom: 13994 ft.

 Completed Information for Formation CODELL
1st Production Date:9/24/2018Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/6/2018Treatment End Date:5/10/2018
Treatment Summary:PERF AND FRAC FROM 8250-13994. 24 BBL 15% HCL ACID, 86 BBL 7.5% HCL ACID, 1,968 BBL PUMP DOWN, 76,194 BBL SLICKWATER, 78,271 TOTAL FLUID, 2,317,730# 40/70 GENOA/SAND HILLS, 2,317,730# TOTAL SAND.
Total fluid used in treatment (bbls):78271Max pressure during treatment (psi):7549
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):110Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):1590Total flowback volume recovered (bbls):5047
Fresh water used in treatment (bbls):76571Disposition method For flowback:RECYCLE
Total proppant used (lbs):2317730Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7551 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 139
BBLS_OIL 115
BTU_GAS 1258
CALC_BBLS_H2O 139
CALC_BBLS_OIL 115
CALC_GOR 1722
CALC_MCF_GAS 198
CASING_PRESS 2300
GRAVITY_OIL 56
MCF_GAS 198
TUBING_PRESS 1400
Perforation Data:
Interval Top:8250 ft.# Of Holes:252
Interval Bottom:13994 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4104
Total Gas Produced (MCF)73567
GOR17925
GOR DeterminationMCFE
Average BOE per Day45.950
Average MCFE per Day266.474

 Federal Financial Assurance  i 

 Tribal Well  i No