Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45089
Well Classification: OW Status: PR - 4/1/2020
Well Name/No:NEWBY STATE #15N-4HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2020
FacilityID:451360LocationID:449884
County:WELD #123Location:SWSE 33 3N68W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:589FSL  1440 FELLat/Long: 40.176576 / -105.003503Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176578 / -105.003502Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/3/2018
End Date: 6/14/2018
Reported: 7/31/2018
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2020             Measured TD: 13762 ft.    Vertical TD: 7299 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/11/2019
Proposed Top PZ Location:Sec:4 Twp: 2N 68W Footage: 51 FNL  1592 FEL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 830 FNL  1661 FEL
Proposed Depth/Form:13611 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13601 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1597, Top: , Bottom: 13601 ft.

Wellbore Completed
Completion Date:2/4/2018
Spud Date:10/25/2017Spud Date Is:ACTUAL
Measured TD:13762 ft.Measured PB depth:13751 ft.
True Vertical TD:7299 ft.True Vertical PB depth:7299 ft.
Top PZ Location:Sec:4 Twp: 2N 68WFootage: 33 FNL  1594 FEL
Bottom Hole Location:Sec:9 Twp: 2N 68WFootage: 828 FNL  1665 FEL
Log Types:GR, CBL, (CNL IN API 05-123-45091).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2250 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 834, Top: 0 ft., Bottom: 2250 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13751 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1400, Top: 1346 ft., Bottom: 13762 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4077 ft.
SHARON SPRINGS7092 ft.
NIOBRARA7268 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2020                  Interval Top: 7696 ft.    Interval Bottom: 21121 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/24/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/3/2018Treatment End Date:6/14/2018
Treatment Summary:PERF AND FRAC FROM 7696-21121. 24 BBL 15% HCL ACID, 833 BBL 7.5% HCL ACID, 8,313 BBL PUMP DOWN, 208,930 BBL SLICKWATER, 218,100 TOTAL FLUID, 4,728,090# 40/70 GENOA/SAND HILLS, 4,728,090# TOTAL SAND.
Total fluid used in treatment (bbls):218100Max pressure during treatment (psi):7823
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):857Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):1460Total flowback volume recovered (bbls):4085
Fresh water used in treatment (bbls):215783Disposition method For flowback:RECYCLE
Total proppant used (lbs):4728090Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7200 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 36
BTU_GAS 1258
CALC_BBLS_H2O 10
CALC_BBLS_OIL 36
CALC_GOR 1639
CALC_MCF_GAS 59
CASING_PRESS 1050
GRAVITY_OIL 56
MCF_GAS 59
TUBING_PRESS 1200
Perforation Data:
Interval Top:7696 ft.# Of Holes:236
Interval Bottom:21121 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4927
Total Gas Produced (MCF)89716
GOR18209
GOR DeterminationMCFE
Average BOE per Day55.931
Average MCFE per Day324.384

 Federal Financial Assurance  i 

 Tribal Well  i No