Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45044
Well Classification: OW Status: PR - 11/22/2017
Well Name/No:Leonard #9C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/22/2017
FacilityID:451251LocationID:318683
County:WELD #123Location:NWSW 21 2N67W 6
Field:WATTENBERG - #90750Elevation:5004 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1740FSL  494 FWLLat/Long: 40.121261 / -104.903274Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.121262 / -104.903283Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/13/2017
End Date: 10/17/2017
Reported: 11/13/2017
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/22/2017             Measured TD: 12330 ft.    Vertical TD: 7625 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/22/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/27/2019
Proposed Top PZ Location:Sec:21 Twp: 2N 67W Footage: 563 FSL  493 FWL
Bottom Hole Location:Sec:21 Twp: 2N 67W Footage: 568 FSL  487 FEL
Proposed Depth/Form:12508 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12508 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1604, Top: , Bottom: 12508 ft.

Wellbore Completed
Completion Date:9/30/2017
Spud Date:8/26/2017Spud Date Is:ACTUAL
Measured TD:12330 ft.Measured PB depth:12318 ft.
True Vertical TD:7625 ft.True Vertical PB depth:7625 ft.
Top PZ Location:Sec:21 Twp: 2N 67WFootage: 563 FSL  493 FWL
Bottom Hole Location:Sec:21 Twp: 2N 67WFootage: 568 FSL  487 FEL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45047).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1568 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1568 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12318 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2050, Top: 250 ft., Bottom: 12318 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4216 ft.NN
SUSSEX4570 ft.NN
SHANNON5168 ft.NN
SHARON SPRINGS7382 ft.NN
NIOBRARA7479 ft.NN
FORT HAYS7940 ft.NN
CODELL8127 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/14/2018                Interval Top: 8138 ft.    Interval Bottom: 12270 ft.

 Completed Information for Formation CODELL
1st Production Date:12/2/2017Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/13/2017Treatment End Date:10/17/2017
Treatment Summary:Producing interval: 8138'-12270'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8138 ft.# Of Holes:745
Interval Bottom:12270 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 11/22/2017                Interval Top: 8075 ft.    Interval Bottom: 12270 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:12/2/2017Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/13/2017Treatment End Date:10/17/2017
Treatment Summary:22-stage plug-and-perf; 87958 total bbls fluid pumped: 87946 bbls fresh water and 12 bbls 15% HCl acid pumped; 4400410 total lbs proppant pumped: 30/50.
Total fluid used in treatment (bbls):87958Max pressure during treatment (psi):8006
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.32
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4983
Fresh water used in treatment (bbls):87946Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4400410Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8030 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2017Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 686
BBLS_OIL 285
BTU_GAS 1335
CALC_BBLS_H2O 686
CALC_BBLS_OIL 285
CALC_GOR 2635
CALC_MCF_GAS 751
CASING_PRESS 2451
GRAVITY_OIL 47
MCF_GAS 751
TUBING_PRESS 1750
Perforation Data:
Interval Top:8075 ft.# Of Holes:757
Interval Bottom:12270 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/14/2018                Interval Top: 8075 ft.    Interval Bottom: 8107 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:12/2/2017Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/13/2017Treatment End Date:10/17/2017
Treatment Summary:Producing interval: 8075'-8107'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8075 ft.# Of Holes:12
Interval Bottom:8107 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2183
Total Gas Produced (MCF)50191
GOR22991
GOR DeterminationMCFE
Average BOE per Day29.717
Average MCFE per Day172.370

 Federal Financial Assurance  i 

 Tribal Well  i No