|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/5/2020 Measured TD: 19510 ft. Vertical TD: 6988 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/5/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/26/2019 | | Proposed Top PZ Location: | Sec:20 Twp: 5N 65W | Footage: 2258 FSL 460 FEL | | Bottom Hole Location: | Sec:24 Twp: 5N 66W | Footage: 2338 FSL 2214 FEL | | Proposed Depth/Form: | 19614 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 19614 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1900, Top: 1500 ft., Bottom: 19614 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/29/2020 | | Spud Date: | 4/18/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 19510 ft. | Measured PB depth: | 19495 ft. | | True Vertical TD: | 6988 ft. | True Vertical PB depth: | 6988 ft. | | Top PZ Location: | Sec:20 Twp: 5N 65W | Footage: 2199 FSL 513 FEL | | Bottom Hole Location: | Sec:24 Twp: 5N 66W | Footage: 2289 FSL 2169 FEL | | Log Types: | No logs run on surface hole. | | Log Types: | CBL, Mud Log, MWD/LWD, (Resistivity on 123-45937). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1588 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1588 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19495 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3167, Top: 430 ft., Bottom: 19510 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3620 ft. | | N | N | | SUSSEX | 4090 ft. | | N | N | | SHANNON | 4780 ft. | | N | N | | SHARON SPRINGS | 6740 ft. | | N | N | | NIOBRARA | 6759 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 8/5/2020 Interval Top: 7279 ft. Interval Bottom: 19481 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/24/2020 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/24/2020 | Treatment End Date: | 4/2/2020 | | Treatment Summary: | Frac'd Niobrara with 54-stage plug-and-perf;
170309 total bbls fluid pumped: 144977 bbls gelled fluid, 25145 bbls fresh water, and 187 bbls 28% HCl acid;
13375240 total lbs proppant pumped: 6749730 lbs 40/70 mesh and 6625510 lbs 30/50 mesh. | | Total fluid used in treatment (bbls): | 170309 | Max pressure during treatment (psi): | 9280 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 54 | | Total acid used in treatment (bbls): | 187 | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 25353 | | Fresh water used in treatment (bbls): | 25145 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 13375240 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7252 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/5/2020 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 151 | | BBLS_OIL | 425 | | BTU_GAS | 1247 | | CALC_BBLS_H2O | 151 | | CALC_BBLS_OIL | 425 | | CALC_GOR | 7111 | | CALC_MCF_GAS | 3022 | | CASING_PRESS | 2885 | | GRAVITY_OIL | 55 | | MCF_GAS | 3022 | | TUBING_PRESS | 2550 |
| | Perforation Data: | | Interval Top: | 7279 ft. | # Of Holes: | 1591 | | Interval Bottom: | 19481 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 5213 |
| Total Gas Produced (MCF) | 140001 |
| GOR | 26856 |
| GOR Determination | MCFE |
| Average BOE per Day | 80.630 |
| Average MCFE per Day | 467.640 |
| Federal Financial Assurance | i | |
|
|