Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45007
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Raindance FC #26-369HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:451168LocationID:427917
Municipality/County:WINDSOR / WELD #123Location:NENE 30 6N67W 6
Field:WATTENBERG - #90750Elevation:4783 ft.
Planned Location:929FNL  316 FELLat/Long: 40.462433 / -104.927597Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.462435 / -104.927596Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/25/2017
End Date: 12/10/2017
Reported: 1/9/2018
Days to report: 30
Disclosure: Sidetrack #00
Start Date: 4/9/2019
End Date: 4/20/2019
Reported: 5/14/2019
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 20475 ft.    Vertical TD: 6949 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/21/2019
Proposed Top PZ Location:Sec:30 Twp: 6N 67W Footage: 506 FSL  604 FEL
Bottom Hole Location:Sec:26 Twp: 6N 68W Footage: 505 FSL  2173 FEL
Proposed Depth/Form:20538 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1900 , Unit Acreage: 771, Drill Unit: S30:S2;S25:S2;S26:SE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20538 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2650, Top: 0 ft., Bottom: 20538 ft.

Wellbore Completed
Completion Date:9/8/2017
Spud Date:8/30/2017Spud Date Is:ACTUAL
Measured TD:20475 ft.Measured PB depth:20464 ft.
True Vertical TD:6949 ft.True Vertical PB depth:6950 ft.
Top PZ Location:Sec:30 Twp: 6N 67WFootage: 506 FSL  604 FEL
Bottom Hole Location:Sec:26 Twp: 6N 68WFootage: 505 S  2173 E
Log Types:CBL, Mud Log, MWD/LWD, (Composite in 123-44988)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1558 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 687, Top: 0 ft., Bottom: 1558 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20475 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 3265, Top: 0 ft., Bottom: 20475 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3792 ft.4173 ft.NN
SUSSEX4418 ft.4684 ft.NN
SHANNON5070 ft.5174 ft.NN
SHARON SPRINGS7668 ft.NN
NIOBRARA7826 ft.NN
FORT HAYS8309 ft.NN
CODELL8371 ft.NN
CARLILE13723 ft.NN

Formation CD-CRL                 Formation Classification:  OW                 Status:  CM - 2/28/2018                 Interval Top: 15832 ft.    Interval Bottom: 20324 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:1/25/2018Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/25/2017Treatment End Date:12/10/2017
Treatment Summary:254,793 lbs 100 Mesh Sand; 4,350,464 lbs20/40 Sand; 108,741 bbls Gelled Fluid. Flowback determined from well test separator.
Total fluid used in treatment (bbls):108741Max pressure during treatment (psi):4180
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):13683
Fresh water used in treatment (bbls):108741Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4605257Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8146 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 118
BBLS_OIL 406
BTU_GAS 1342
CALC_BBLS_H2O 118
CALC_BBLS_OIL 406
CALC_GOR 1032
CALC_MCF_GAS 419
CASING_PRESS 2202
GRAVITY_OIL 41
MCF_GAS 419
TUBING_PRESS 2016
Perforation Data:
Interval Top:15832 ft.# Of Holes:690
Interval Bottom:20324 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/13/2020                 Interval Top: 13723 ft.    Interval Bottom: 20324 ft.

 Completed Information for Formation CARLILE
1st Production Date:1/25/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile refrac Perf Interval: 13723'-14081'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13723 ft.# Of Holes:1770
Interval Bottom:20324 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/10/2020                 Interval Top: 11700 ft.    Interval Bottom: 13369 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/18/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 11700'-12020', 13289' -13369'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11700 ft.# Of Holes:1770
Interval Bottom:13369 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/1/2024                  Interval Top: 8632 ft.    Interval Bottom: 20324 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:5/18/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/9/2019Treatment End Date:4/20/2019
Treatment Summary:361,262# 100 Mesh Sand; 6,855,290# 20/40 Sand; 126,483 bbls gelled fluid; Flowback determined from well test separator. 1,080 holes were shot from 8,632' - 15,832' during the refrac.
Total fluid used in treatment (bbls):126483Max pressure during treatment (psi):4622
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):14205
Fresh water used in treatment (bbls):126483Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7216552Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 595
BBLS_OIL 410
BTU_GAS 1250
CALC_BBLS_H2O 595
CALC_BBLS_OIL 410
CALC_GOR 1690
CALC_MCF_GAS 693
CASING_PRESS 1700
GRAVITY_OIL 43
MCF_GAS 693
TUBING_PRESS 1300
Perforation Data:
Interval Top:8632 ft.# Of Holes:1770
Interval Bottom:20324 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/13/2020                 Interval Top: 8632 ft.    Interval Bottom: 20258 ft.

 Completed Information for Formation CODELL
1st Production Date:1/25/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell refrac Perf Interval: 8632'-11699', 12021'-13288', 13370'-13722', 14082'-15832'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8632 ft.# Of Holes:1770
Interval Bottom:20258 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)4910
Total Gas Produced (MCF)3907
GOR795
GOR DeterminationBOE
Average BOE per Day15.391
Average MCFE per Day89.266

 Federal Financial Assurance  i 

 Tribal Well  i No