Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44921
Well Classification: OW Status: PR - 11/18/2020
Well Name/No:SLIGO #8-67-26-23C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:DUNAMIS ENERGY OPERATING LLC - 10848
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/18/2020
FacilityID:450817LocationID:450827
County:WELD #123Location:SWSE 26 8N67W 6
Field:DJ HORIZONTAL NBRR-FTHYS-CODL - #16953Elevation:5188 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:299FSL  2146 FELLat/Long: 40.626117 / -104.858296Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.626114 / -104.858297Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2018
End Date: 6/30/2018
Reported: 8/8/2018
Days to report: 39
Disclosure: Sidetrack #00
Start Date: 6/30/2018
End Date: 7/15/2018
Reported: 12/9/2019
Days to report: 512
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/18/2020             Measured TD: 17250 ft.    Vertical TD: 7347 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/18/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/25/2019
Proposed Top PZ Location:Sec:26 Twp: 8N 67W Footage: 666 FSL  650 FEL
Bottom Hole Location:Sec:23 Twp: 8N 67W Footage: 650 FNL  650 FEL
Proposed Depth/Form:17194 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 535-774  , Unit Acreage: 1280, Drill Unit: Sec 26 & Sec 23: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 304, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17194 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2768, Top: 0 ft., Bottom: 17194 ft.

Wellbore Completed
Completion Date:4/15/2018
Spud Date:3/27/2018Spud Date Is:ACTUAL
Measured TD:17250 ft.Measured PB depth:17224 ft.
True Vertical TD:7347 ft.True Vertical PB depth:7347 ft.
Top PZ Location:Sec:26 Twp: 8W 67WFootage: 663 FSL  623 FEL
Bottom Hole Location:Sec:23 Twp: 8N 67WFootage: 631 FNL  725 FEL
Log Types:MWD/LWD, CBL, Mud Log, RES
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 103 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 62, Top: 0 ft., Bottom: 103 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1624 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 557, Top: 0 ft., Bottom: 1624 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17243 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2476, Top: 1604 ft., Bottom: 17250 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RICHARD3640 ft.NN
SUSSEX4275 ft.NN
HYGIENE4875 ft.NN
SHARON SPRINGS7199 ft.NN
NIOBRARA7232 ft.NN
FORT HAYS7701 ft.NN
CODELL7792 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  PR - 11/18/2020                Interval Top: 8525 ft.    Interval Bottom: 15445 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/4/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:Completed Interval: 8,525' - 8,679'; 9,450' - 9,660'; 10,556' - 10,730'; 12,086' - 12,856; 15,250; - 15,445'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8525 ft.# Of Holes:172
Interval Bottom:15445 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/18/2020                Interval Top: 8219 ft.    Interval Bottom: 8509 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/4/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:Completed Interval: 8,219' - 8,509'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8219 ft.# Of Holes:50
Interval Bottom:8509 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 11/18/2020                Interval Top: 7914 ft.    Interval Bottom: 17206 ft.

 Completed Information for Formation CODELL
1st Production Date:8/4/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:Completed Interval : 7,914' - 8,207'; 8,697' - 9,436'; 9,677' - 10,543'; 10,750' - 12,071'; 12,146' - 12,755'; 12,900' - 15,234'; 15,460; - 17,206'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7914 ft.# Of Holes:1379
Interval Bottom:17206 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  CM - 8/1/2018                  Interval Top: 7914 ft.    Interval Bottom: 17206 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:8/4/2018Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:40 stages, 3,281,580 lbs 100Mesh white sand, 5,572,540 lbs 30/50 mesh regional sand, 1,136,380 lbs 30/50 white sand, 224,996 bbls Slickwater, 20,300 gal 15% concentration HCL acid.
Total fluid used in treatment (bbls):225479Max pressure during treatment (psi):8251
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):483Min frac gradient (psi/ft):80.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):21769
Fresh water used in treatment (bbls):224996Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9990500Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7511 ft.
Tubing Packer Depth:7498 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/1/2018Test Method:Flowback
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 1084
BBLS_OIL 258
BTU_GAS 1475
CALC_BBLS_H2O 1084
CALC_BBLS_OIL 258
CALC_GOR 628
CALC_MCF_GAS 162
GRAVITY_OIL 40
MCF_GAS 162
TUBING_PRESS 740
Perforation Data:
Interval Top:7914 ft.# Of Holes:1601
Interval Bottom:17206 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)8823
Total Gas Produced (MCF)9087
GOR1029
GOR DeterminationBOE
Average BOE per Day28.545
Average MCFE per Day165.556

 Federal Financial Assurance  i 

 Tribal Well  i No