|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/25/2018 Measured TD: 12986 ft. Vertical TD: 7073 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/25/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/13/2019 | Proposed Top PZ Location: | Sec:33 Twp: 3N 65W | Footage: 151 FNL 167 FWL | Bottom Hole Location: | Sec:4 Twp: 2N 65W | Footage: 362 FNL 245 FWL | Proposed Depth/Form: | 13058 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13048 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1530, Top: , Bottom: 13048 ft. |
| | |
Wellbore Completed | Completion Date: | 9/6/2017 | Spud Date: | 6/29/2017 | Spud Date Is: | ACTUAL | Measured TD: | 12986 ft. | Measured PB depth: | 12884 ft. | True Vertical TD: | 7073 ft. | True Vertical PB depth: | 7080 ft. | Top PZ Location: | Sec:33 Twp: 3N 65W | Footage: 316 FNL 270 FWL | Bottom Hole Location: | Sec:4 Twp: 2N 65W | Footage: 360 FNL 268 FWL | Log Types: | LWD/GR, CBL, (CNL in 05-123-44801) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1887 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 734, Top: 0 ft., Bottom: 1887 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12975 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1260, Top: 990 ft., Bottom: 12986 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4713 ft. | | | | SHARON SPRINGS | 7151 ft. | | | | NIOBRARA | 7284 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/25/2018 Interval Top: 7631 ft. Interval Bottom: 12874 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/28/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 12/11/2017 | Treatment End Date: | 12/23/2017 | Treatment Summary: | PERF AND FRAC FROM 7631-12874.
962 BBL 7.5% HCL ACID, 6,853 BBL PUMP DOWN, 183,053 BBL SLICKWATER, 190,868 TOTAL FLUID, 1,575,600# 40/70 OTTAWA/ST. PETERS, 1,575,600# TOTAL SAND. | Total fluid used in treatment (bbls): | 190868 | Max pressure during treatment (psi): | 7605 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 50 | Total acid used in treatment (bbls): | 962 | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | 5180 | Total flowback volume recovered (bbls): | 5180 | Fresh water used in treatment (bbls): | 184726 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 1575600 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7073 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/25/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 123 | BBLS_OIL | 197 | BTU_GAS | 1256 | CALC_BBLS_H2O | 123 | CALC_BBLS_OIL | 197 | CALC_GOR | 2959 | CALC_MCF_GAS | 583 | CASING_PRESS | 2503 | GRAVITY_OIL | 61 | MCF_GAS | 583 | TUBING_PRESS | 1656 |
| Perforation Data: | Interval Top: | 7631 ft. | # Of Holes: | 1200 | Interval Bottom: | 12874 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 7875 |
Total Gas Produced (MCF) | 53726 |
GOR | 6822 |
GOR Determination | BOE |
Average BOE per Day | 46.948 |
Average MCFE per Day | 272.266 |
Federal Financial Assurance | i | |
|
|