|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2025 Measured TD: 17722 ft. Vertical TD: 7011 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/13/2019 | Proposed Top PZ Location: | Sec:34 Twp: 3N 65W | Footage: 170 FNL 214 FWL | Bottom Hole Location: | Sec:3 Twp: 2N 65W | Footage: 201 FSL 215 FWL | Proposed Depth/Form: | 17629 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17619 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2088, Top: , Bottom: 17619 ft. |
| | |
Wellbore Completed | Completion Date: | 9/15/2017 | Spud Date: | 7/27/2017 | Spud Date Is: | ACTUAL | Measured TD: | 17722 ft. | Measured PB depth: | 17706 ft. | True Vertical TD: | 7011 ft. | True Vertical PB depth: | 7011 ft. | Top PZ Location: | Sec:34 Twp: 3N 65W | Footage: 170 FNL 214 FWL | Bottom Hole Location: | Sec:3 Twp: 2N 65W | Footage: 201 FSL 215 FWL | Log Types: | MWD, CBL, (CNL in 123-44792) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1884 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 671, Top: 0 ft., Bottom: 1884 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17708 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1820, Top: 0 ft., Bottom: 17708 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4652 ft. | | | | SHARON SPRINGS | 7092 ft. | | | | NIOBRARA | 7207 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 7643 ft. Interval Bottom: 17662 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/29/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/12/2018 | Treatment End Date: | 1/28/2018 | Treatment Summary: | PERF AND FRAC FROM 7643-17662.
931 BBL 7.5% HCL ACID, 10,764 BBL PUMP DOWN, 275,149 BBL SLICKWATER, 286,844 TOTAL FLUID, 440,733# 100 MESH US SILICA, 7,864,314# 40/70 OTTAWA/ST. PETERS, 8,305,047# TOTAL SAND. | Total fluid used in treatment (bbls): | 286844 | Max pressure during treatment (psi): | 7786 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 38 | Total acid used in treatment (bbls): | 931 | Min frac gradient (psi/ft): | 0.90 | Recycled water used in treatment (bbls): | 2470 | Total flowback volume recovered (bbls): | 2470 | Fresh water used in treatment (bbls): | 283443 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 8305047 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7151 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/26/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 99 | BBLS_OIL | 176 | BTU_GAS | 1256 | CALC_BBLS_H2O | 99 | CALC_BBLS_OIL | 176 | CALC_GOR | 2926 | CALC_MCF_GAS | 515 | CASING_PRESS | 2650 | GRAVITY_OIL | 61 | MCF_GAS | 515 | TUBING_PRESS | 2100 |
| Perforation Data: | Interval Top: | 7643 ft. | # Of Holes: | 909 | Interval Bottom: | 17662 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5181 |
Total Gas Produced (MCF) | 38448 |
GOR | 7420 |
GOR Determination | BOE |
Average BOE per Day | 32.074 |
Average MCFE per Day | 186.015 |
Federal Financial Assurance | i | |
|
|