Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44784
Well Classification: OW Status: PR - 4/18/2018
Well Name/No:CANNON #27N-4HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/18/2018
FacilityID:450553LocationID:450561
County:WELD #123Location:NENE 33 3N65W 6
Field:WATTENBERG - #90750Elevation:4835 ft.
Planned Location:520FNL  522 FELLat/Long: 40.187742 / -104.661048Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.187741 / -104.661046Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/12/2017
End Date: 12/23/2017
Reported: 1/24/2018
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/18/2018             Measured TD: 13355 ft.    Vertical TD: 7027 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/18/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/13/2019
Proposed Top PZ Location:Sec:33 Twp: 3N 65W Footage: 149 FNL  2054 FEL
Bottom Hole Location:Sec:4 Twp: 2N 65W Footage: 373 FNL  2063 FEL
Proposed Depth/Form:13253 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13243 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1553, Top: , Bottom: 13243 ft.

Wellbore Completed
Completion Date:10/28/2017
Spud Date:7/23/2017Spud Date Is:ACTUAL
Measured TD:13355 ft.Measured PB depth:13342 ft.
True Vertical TD:7027 ft.True Vertical PB depth:7027 ft.
Top PZ Location:Sec:33 Twp: 3N 65WFootage: 107 FNL  2066 FEL
Bottom Hole Location:Sec:4 Twp: 2N 65WFootage: 367 FNL  2066 FEL
Log Types:MWD, CBL, (CNL in 123-44792)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1914 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 681, Top: 0 ft., Bottom: 1914 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13343 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1270, Top: 730 ft., Bottom: 13343 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4789 ft.
SHARON SPRINGS7327 ft.
NIOBRARA7428 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/18/2018                 Interval Top: 7810 ft.    Interval Bottom: 13300 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/28/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/12/2017Treatment End Date:12/23/2017
Treatment Summary:PERF AND FRAC FROM 7810-13300. 1,103 BBL 7.5% HCL ACID, 14,726 BBL PUMP DOWN, 196,138 BBL SLICKWATER, 211,967 TOTAL FLUID, 1,650,739# 40/70 OTTAWA/ST. PETERS, 1,650,739# TOTAL SAND.
Total fluid used in treatment (bbls):211967Max pressure during treatment (psi):7687
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:53
Total acid used in treatment (bbls):1103Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):850Total flowback volume recovered (bbls):850
Fresh water used in treatment (bbls):210014Disposition method For flowback:RECYCLE
Total proppant used (lbs):1650739Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7407 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 257
BBLS_OIL 162
BTU_GAS 1256
CALC_BBLS_H2O 257
CALC_BBLS_OIL 162
CALC_GOR 3679
CALC_MCF_GAS 596
CASING_PRESS 2523
GRAVITY_OIL 61
MCF_GAS 596
TUBING_PRESS 1498
Perforation Data:
Interval Top:7810 ft.# Of Holes:1196
Interval Bottom:13300 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)4261
Total Gas Produced (MCF)25537
GOR5993
GOR DeterminationBOE
Average BOE per Day23.628
Average MCFE per Day137.063

 Federal Financial Assurance  i 

 Tribal Well  i No