|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2021 Measured TD: 12563 ft. Vertical TD: 7727 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/6/2019 | Proposed Top PZ Location: | Sec:26 Twp: 1N 66W | Footage: 460 FNL 610 FWL | Bottom Hole Location: | Sec:26 Twp: 1N 66W | Footage: 460 FSL 610 FWL | Proposed Depth/Form: | 12666 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1952 , Unit Acreage: 320, Drill Unit: Sec 26: W2 | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 509, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12666 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1634, Top: , Bottom: 12666 ft. |
| | |
Wellbore Completed | Completion Date: | 7/13/2017 | Spud Date: | 6/15/2017 | Spud Date Is: | ACTUAL | Measured TD: | 12563 ft. | Measured PB depth: | 12493 ft. | True Vertical TD: | 7727 ft. | True Vertical PB depth: | 7728 ft. | Top PZ Location: | Sec:26 Twp: 1N 66W | Footage: 526 FNL 598 FWL | Bottom Hole Location: | Sec:26 Twp: 1N 66W | Footage: 347 FSL 625 FWL | Log Types: | CBL, Mud, MWD/LWD, (Resistivity in 123-44742) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1483 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 0 ft., Bottom: 1483 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12539 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1560, Top: 0 ft., Bottom: 12563 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4497 ft. | 4656 ft. | N | N | SUSSEX | 4867 ft. | 5101 ft. | N | N | SHANNON | 5619 ft. | 5797 ft. | N | N | SHARON SPRINGS | 7276 ft. | | N | N | NIOBRARA | 7391 ft. | | N | N | FORT HAYS | 7905 ft. | | N | N | CODELL | 7946 ft. | | N | N | CARLILE | 9692 ft. | | N | N |
Formation CARL Formation Classification: OW Status: CM - 11/13/2020 Interval Top: 9692 ft. Interval Bottom: 9947 ft. Completed Information for Formation CARLILE | 1st Production Date: | 8/23/2017 | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 9692 ft. | # Of Holes: | 750 | Interval Bottom: | 9947 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/13/2020 Interval Top: 8762 ft. Interval Bottom: 12302 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/23/2017 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/13/2020 | Treatment End Date: | N/A | Treatment Summary: | 8762-9691; 9948-12302
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8762 ft. | # Of Holes: | 750 | Interval Bottom: | 12302 ft. | Hole Size: | 0.42 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 11/1/2021 Interval Top: 8135 ft. Interval Bottom: 12302 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 8/23/2017 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/24/2017 | Treatment End Date: | 8/6/2017 | Treatment Summary: | 60 bbls 15% HCl; 5,253,910# 40/70 sand; 1,324,240# 30/50 sand; 185,141 bbls slickwater and gelled fluid. Flowback determined from well test separator
| Total fluid used in treatment (bbls): | 185201 | Max pressure during treatment (psi): | 7470 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 25 | Total acid used in treatment (bbls): | 60 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7584 | Fresh water used in treatment (bbls): | 185141 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 6578150 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/27/2017 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 565 | BBLS_OIL | 481 | BTU_GAS | 1375 | CALC_BBLS_H2O | 565 | CALC_BBLS_OIL | 481 | CALC_GOR | 545 | CALC_MCF_GAS | 262 | CASING_PRESS | 1750 | GRAVITY_OIL | 44 | MCF_GAS | 262 |
| Perforation Data: | Interval Top: | 8135 ft. | # Of Holes: | 750 | Interval Bottom: | 12302 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/13/2020 Interval Top: 8135 ft. Interval Bottom: 8761 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 8/23/2017 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8135 ft. | # Of Holes: | 750 | Interval Bottom: | 8761 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1708 |
Total Gas Produced (MCF) | 27023 |
GOR | 15821 |
GOR Determination | MCFE |
Average BOE per Day | 17.431 |
Average MCFE per Day | 101.083 |
Federal Financial Assurance | i | |
|
|