Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44748
Well Classification: OW Status: PR - 4/17/2018
Well Name/No:RW #37N-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/17/2018
FacilityID:450282LocationID:427771
County:WELD #123Location:SWSE 29 3N65W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:372FSL  1561 FELLat/Long: 40.190190 / -104.683501Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.190190 / -104.683501Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/30/2018
End Date: 2/10/2018
Reported: 4/2/2018
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/17/2018             Measured TD: 13292 ft.    Vertical TD: 7073 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/17/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/6/2019
Proposed Top PZ Location:Sec:29 Twp: 3N 65W Footage: 560 FSL  593 FEL
Bottom Hole Location:Sec:32 Twp: 3N 65W Footage: 39 FSL  559 FEL
Proposed Depth/Form:13437 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13427 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1576, Top: , Bottom: 13427 ft.

Wellbore Completed
Completion Date:9/22/2017
Spud Date:7/18/2017Spud Date Is:ACTUAL
Measured TD:13292 ft.Measured PB depth:13192 ft.
True Vertical TD:7073 ft.True Vertical PB depth:7078 ft.
Top PZ Location:Sec:29 Twp: 3N 65WFootage: 438 FSL  591 FEL
Bottom Hole Location:Sec:32 Twp: 3N 65WFootage: 123 FSL  554 FEL
Log Types:GR, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1839 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 631, Top: 0 ft., Bottom: 1839 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13281 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1350, Top: 756 ft., Bottom: 13292 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4777 ft.
SHARON SPRINGS7078 ft.
NIOBRARA7176 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/17/2018                 Interval Top: 7692 ft.    Interval Bottom: 13184 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/21/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:2/10/2018
Treatment Summary:PERF AND FRAC FROM 7692-13184. 1,276 BBL 7.5% HCL ACID, 8,171 BBL PUMP DOWN, 195,257 BBL SLICKWATER, 204,704 TOTAL FLUID, 1,651,787# 40/70 OTTAWA/ST. PETERS, 1,651,787# TOTAL SAND.
Total fluid used in treatment (bbls):204704Max pressure during treatment (psi):7993
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):1276Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):4010Total flowback volume recovered (bbls):4010
Fresh water used in treatment (bbls):199418Disposition method For flowback:RECYCLE
Total proppant used (lbs):1651787Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7216 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/17/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 74
BBLS_OIL 44
BTU_GAS 1256
CALC_BBLS_H2O 74
CALC_BBLS_OIL 44
CALC_GOR 4477
CALC_MCF_GAS 197
CASING_PRESS 2400
GRAVITY_OIL 60
MCF_GAS 197
TUBING_PRESS 1700
Perforation Data:
Interval Top:7692 ft.# Of Holes:1248
Interval Bottom:13184 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)5223
Total Gas Produced (MCF)57583
GOR11024
GOR DeterminationBOE
Average BOE per Day41.533
Average MCFE per Day240.881

 Federal Financial Assurance  i 

 Tribal Well  i No