|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2022 Measured TD: 14534 ft. Vertical TD: 7485 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/24/2019 | Proposed Top PZ Location: | Sec:34 Twp: 1N 66W | Footage: 2185 FSL 1123 FEL | Bottom Hole Location: | Sec:3 Twp: 1s 66w | Footage: 460 FSL 1123 FEL | Proposed Depth/Form: | 14508 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-1908 , Unit Acreage: 960, Drill Unit: S 3: All, S 34: S/2 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 462, Top: 0 ft., Bottom: 1700 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14508 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1863, Top: , Bottom: 14508 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6931 ft., Depth: 14508 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 7/30/2017 | Spud Date: | 5/28/2017 | Spud Date Is: | ACTUAL | Measured TD: | 14534 ft. | Measured PB depth: | 14418 ft. | True Vertical TD: | 7485 ft. | True Vertical PB depth: | 7487 ft. | Top PZ Location: | Sec:34 Twp: 1N 66W | Footage: 2154 FSL 1148 FEL | Bottom Hole Location: | Sec:3 Twp: 1S 66W | Footage: 535 S 1124 E | Log Types: | LWD/MWD,CBL, (Resistivity in API 123-44646) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1709 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 780, Top: 0 ft., Bottom: 1709 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14517 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2000, Top: 210 ft., Bottom: 14534 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | | 1100 ft. | N | N | PARKMAN | 4516 ft. | | N | N | SUSSEX | 4824 ft. | | N | N | SHARON SPRINGS | 7310 ft. | | N | N | NIOBRARA | 7329 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2022 Interval Top: 7935 ft. Interval Bottom: 14187 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/21/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/17/2018 | Treatment End Date: | 3/2/2018 | Treatment Summary: | 315,427 FR Water, 9857 Treated Water, 1514 7.5 HCI Acid, 897 Brine, 32652 FDP water, 2301467 lbs 100 Mesh, 6604995 lbs White 40/70
Flowback volume measured by strapping the flowback tank every hour during initial flowback, and from the tank gauges during permanent facility flowback. | Total fluid used in treatment (bbls): | 360347 | Max pressure during treatment (psi): | 9129 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 45 | Total acid used in treatment (bbls): | 1514 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 20488 | Fresh water used in treatment (bbls): | 358833 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 8906462 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/24/2018 | Test Method: | Flowback | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 2774 | BBLS_OIL | 718 | BTU_GAS | 1338 | CALC_BBLS_H2O | 2774 | CALC_BBLS_OIL | 718 | CALC_GOR | 533 | CALC_MCF_GAS | 383 | CASING_PRESS | 1850 | GRAVITY_OIL | 39 | MCF_GAS | 383 |
| Perforation Data: | Interval Top: | 7935 ft. | # Of Holes: | 1072 | Interval Bottom: | 14187 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2820 |
Total Gas Produced (MCF) | 38506 |
GOR | 13654 |
GOR Determination | BOE |
Average BOE per Day | 25.823 |
Average MCFE per Day | 149.792 |
Federal Financial Assurance | i | |
|
|