Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44624
Well Classification: OW Status: PR - 4/1/2022
Well Name/No:HOMESTEAD #20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PETRO OPERATING COMPANY LLC - 10583
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2022
FacilityID:450067LocationID:450069
Municipality/County:BRIGHTON / WELD #123Location:NESE 34 1N66W 6
Field:WATTENBERG - #90750Elevation:5132 ft.
Planned Location:2446FSL  1000 FELLat/Long: 40.007200 / -104.757430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.007200 / -104.757320Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/4/2018
End Date: 3/17/2018
Reported: 4/16/2019
Originally Reported: 4/13/2018
Days to report: 395
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2022             Measured TD: 14799 ft.    Vertical TD: 7710 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/24/2019
Proposed Top PZ Location:Sec:34 Twp: 1N 66W Footage: 2185 FSL  1068 FEL
Bottom Hole Location:Sec:3 Twp: 1S 66W Footage: 460 FSL  1068 FEL
Proposed Depth/Form:14830 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1908 , Unit Acreage: 960, Drill Unit: S 3: All, S 34: S/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 462, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14830 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1898, Top: , Bottom: 14830 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7025 ft., Depth: 14830 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/3/2017
Spud Date:5/22/2017Spud Date Is:ACTUAL
Measured TD:14799 ft.Measured PB depth:14681 ft.
True Vertical TD:7710 ft.True Vertical PB depth:7710 ft.
Top PZ Location:Sec:34 Twp: 1N 66WFootage: 2156 FSL  1065 FEL
Bottom Hole Location:Sec:3 Twp: 1S 66WFootage: 460 S  1086 E
Log Types:LWD/MWD,CBL, (Resistivity in API 123-44646)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1732 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 0 ft., Bottom: 1732 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14784 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2025, Top: 1250 ft., Bottom: 14799 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1100 ft.NN
PARKMAN4537 ft.NN
SUSSEX4842 ft.NN
SHARON SPRINGS7294 ft.NN
NIOBRARA7310 ft.NN
FORT HAYS7934 ft.NN
CODELL8081 ft.NN
CARLILE12179 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/2/2019                  Interval Top: 12366 ft.    Interval Bottom: 12603 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/21/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/2/2019Treatment End Date:N/A
Treatment Summary:Top and Bottom Perforation For Fort Hayes: 12366-12603
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12366 ft.# Of Holes:1080
Interval Bottom:12603 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/2/2019                  Interval Top: 12179 ft.    Interval Bottom: 12365 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/21/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/2/2019Treatment End Date:N/A
Treatment Summary:Top and Bottom Perforation Carlie: 12179-12365
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12179 ft.# Of Holes:1080
Interval Bottom:12365 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/1/2022                  Interval Top: 8128 ft.    Interval Bottom: 14593 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/21/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/4/2018Treatment End Date:3/17/2018
Treatment Summary:300,650 bbl FR water, 9979 bbl Treated Water, 827 bbl 7.5% HCI Acid, 7368 bbl FDP Water, 1922894 lbs 100 mesh, 6823643 lbs White 40/70 Flowback volume measured by strapping the flowback tank every hour during initial flowback, and from the tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):318824Max pressure during treatment (psi):9379
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:45
Total acid used in treatment (bbls):827Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):9241
Fresh water used in treatment (bbls):317997Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8746537Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/28/2018Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 1949
BBLS_OIL 874
BTU_GAS 1338
CALC_BBLS_H2O 1949
CALC_BBLS_OIL 874
CALC_GOR 1385
CALC_MCF_GAS 1210
CASING_PRESS 2000
GRAVITY_OIL 39
MCF_GAS 1210
Perforation Data:
Interval Top:8128 ft.# Of Holes:1080
Interval Bottom:14593 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/2/2019                  Interval Top: 8128 ft.    Interval Bottom: 14593 ft.

 Completed Information for Formation CODELL
1st Production Date:8/21/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/2/2019Treatment End Date:N/A
Treatment Summary:Top and Bottom Perforation For Codell: 8287-12178, 12604-14593
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8128 ft.# Of Holes:1080
Interval Bottom:14593 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)8107
Total Gas Produced (MCF)43754
GOR5397
GOR DeterminationBOE
Average BOE per Day42.733
Average MCFE per Day247.848

 Federal Financial Assurance  i 

 Tribal Well  i No