Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44616
Well Classification: OW Status: PR - 6/5/2018
Well Name/No:RW #14N-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/5/2018
FacilityID:450022LocationID:450025
County:WELD #123Location:SESW 29 3N65W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:441FSL  1794 FWLLat/Long: 40.190388 / -104.690303Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.190385 / -104.690303Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2018
End Date: 3/28/2018
Reported: 5/16/2018
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/5/2018             Measured TD: 14249 ft.    Vertical TD: 7025 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/5/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/16/2019
Proposed Top PZ Location:Sec:29 Twp: 3N 65W Footage: 1011 FSL  1865 FWL
Bottom Hole Location:Sec:5 Twp: 2N 65W Footage: 370 FNL  1869 FWL
Proposed Depth/Form:14181 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 280, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 14171 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1667, Top: , Bottom: 14171 ft.

Wellbore Completed
Completion Date:9/3/2017
Spud Date:7/14/2017Spud Date Is:ACTUAL
Measured TD:14249 ft.Measured PB depth:14190 ft.
True Vertical TD:7025 ft.True Vertical PB depth:7028 ft.
Top PZ Location:Sec:29 Twp: 3N 65WFootage: 1088 FSL  1845 FWL
Bottom Hole Location:Sec:5 Twp: 2N 65WFootage: 354 FNL  1876 FWL
Log Types:LWD/GR, CBL, (CNL in 05-123-44617, RESISTIVITY in 05-123-25834)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1852 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 0 ft., Bottom: 1852 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 14239 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1430, Top: 1050 ft., Bottom: 14249 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4750 ft.
SHARON SPRINGS7127 ft.
NIOBRARA7249 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/5/2018                  Interval Top: 7515 ft.    Interval Bottom: 14146 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/7/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2018Treatment End Date:3/28/2018
Treatment Summary:PERF AND FRAC FROM 7515-14146. 1,307 BBL 7.5% HCL ACID, 14,082 BBL PUMP DOWN, 230,444 BBL SLICKWATER, 245,833 TOTAL FLUID, 1,969,341# 40/70 OTTAWA/ST. PETERS, 1,969,341# TOTAL SAND.
Total fluid used in treatment (bbls):245833Max pressure during treatment (psi):7731
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:63
Total acid used in treatment (bbls):1307Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):4050Total flowback volume recovered (bbls):8629
Fresh water used in treatment (bbls):240476Disposition method For flowback:RECYCLE
Total proppant used (lbs):1969341Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7222 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/5/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 49
BBLS_OIL 110
BTU_GAS 1266
CALC_BBLS_H2O 49
CALC_BBLS_OIL 110
CALC_GOR 3282
CALC_MCF_GAS 361
CASING_PRESS 2400
GRAVITY_OIL 60
MCF_GAS 361
TUBING_PRESS 2250
Perforation Data:
Interval Top:7515 ft.# Of Holes:1056
Interval Bottom:14146 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5901
Total Gas Produced (MCF)70883
GOR12012
GOR DeterminationBOE
Average BOE per Day49.425
Average MCFE per Day286.654

 Federal Financial Assurance  i 

 Tribal Well  i No