Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44611
Well Classification: OW Status: PR - 6/1/2018
Well Name/No:RW #13N-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2018
FacilityID:450017LocationID:450025
County:WELD #123Location:SESW 29 3N65W 6
Field:WATTENBERG - #90750Elevation:4887 ft.
Planned Location:441FSL  1704 FWLLat/Long: 40.190391 / -104.690625Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.190389 / -104.690626Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/29/2018
End Date: 4/9/2018
Reported: 5/16/2018
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2018             Measured TD: 13460 ft.    Vertical TD: 7114 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/16/2019
Proposed Top PZ Location:Sec:29 Twp: 3N 65W Footage: 546 FSL  1005 FWL
Bottom Hole Location:Sec:32 Twp: 3N 65W Footage: 66 FSL  1085 FWL
Proposed Depth/Form:13584 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13574 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1594, Top: , Bottom: 13574 ft.

Wellbore Completed
Completion Date:8/20/2017
Spud Date:7/18/2017Spud Date Is:ACTUAL
Measured TD:13460 ft.Measured PB depth:13403 ft.
True Vertical TD:7114 ft.True Vertical PB depth:7114 ft.
Top PZ Location:Sec:29 Twp: 3N 65WFootage: 546 FSL  1005 FWL
Bottom Hole Location:Sec:32 Twp: 3N 65WFootage: 66 FSL  1085 FWL
Log Types:LWD/GR, CBL, (CNL in 05-123-44617, RESISTIVITY in 05-123-25834)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1844 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 707, Top: 0 ft., Bottom: 1844 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13448 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1370, Top: 631 ft., Bottom: 13460 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4743 ft.
NIOBRARA7267 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2018                  Interval Top: 7692 ft.    Interval Bottom: 13359 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/7/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/29/2018Treatment End Date:4/9/2018
Treatment Summary:PERF AND FRAC FROM 7692-13359. 48 BBL 15% HCL ACID,1022 BBL 7.5% HCL ACID, 8,896 BBL PUMP DOWN, 201,112 BBL SLICKWATER, 211,077 TOTAL FLUID, 1,708,572# 40/70 OTTAWA/ST. PETERS, 1,708,572# TOTAL SAND.
Total fluid used in treatment (bbls):211077Max pressure during treatment (psi):7917
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:54
Total acid used in treatment (bbls):1070Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):2100Total flowback volume recovered (bbls):7670
Fresh water used in treatment (bbls):207907Disposition method For flowback:RECYCLE
Total proppant used (lbs):1708572Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7199 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 396
BBLS_OIL 459
BTU_GAS 1266
CALC_BBLS_H2O 396
CALC_BBLS_OIL 459
CALC_GOR 2917
CALC_MCF_GAS 1339
CASING_PRESS 2585
GRAVITY_OIL 60
MCF_GAS 1339
TUBING_PRESS 1918
Perforation Data:
Interval Top:7692 ft.# Of Holes:1296
Interval Bottom:13359 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)5660
Total Gas Produced (MCF)62788
GOR11093
GOR DeterminationBOE
Average BOE per Day45.147
Average MCFE per Day261.842

 Federal Financial Assurance  i 

 Tribal Well  i No