|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2017 Measured TD: 16535 ft. Vertical TD: 7171 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/16/2019 | | Proposed Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 1650 FNL 460 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 1650 FNL 460 FWL | | Proposed Depth/Form: | 17014 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17014 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1600, Top: 1500 ft., Bottom: 17014 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/7/2017 | | Spud Date: | 4/4/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 16535 ft. | Measured PB depth: | 16523 ft. | | True Vertical TD: | 7171 ft. | True Vertical PB depth: | 7171 ft. | | Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 1638 FNL 521 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 1675 FNL 903 FWL | | Log Types: | CBL, Mud, MWD, Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1539 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 1539 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16525 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2600, Top: 112 ft., Bottom: 16525 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3515 ft. | | N | N | | SUSSEX | 4035 ft. | | N | N | | SHANNON | 4606 ft. | | N | N | | SHARON SPRINGS | 6863 ft. | | N | N | | NIOBRARA | 6902 ft. | | N | N | | FORT HAYS | 7386 ft. | | N | N | | CODELL | 7546 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 2/20/2018 Interval Top: 9714 ft. Interval Bottom: 10759 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/20/2018 | Treatment End Date: | N/A | | Treatment Summary: | Producing interval: 9714'-10759' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9714 ft. | # Of Holes: | 186 | | Interval Bottom: | 10759 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 11/23/2017 Interval Top: 7562 ft. Interval Bottom: 16473 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 12/15/2017 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/15/2017 | Treatment End Date: | 8/24/2017 | | Treatment Summary: | 46 stage plug and perf;
141664 total bbls of fluid pumped: 141652 bbls fresh water and 12 bbls 15% HCL acid pumped;
9200250 lbs of 30/50 proppant pumped. | | Total fluid used in treatment (bbls): | 141664 | Max pressure during treatment (psi): | 9044 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | | Type Of gas: | | Number Of staged intervals: | 46 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 20715 | | Fresh water used in treatment (bbls): | 141652 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9200250 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7466 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/23/2017 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 923 | | BBLS_OIL | 146 | | BTU_GAS | 1285 | | CALC_BBLS_H2O | 923 | | CALC_BBLS_OIL | 146 | | CALC_GOR | 1075 | | CALC_MCF_GAS | 157 | | CASING_PRESS | 960 | | GRAVITY_OIL | 43 | | MCF_GAS | 157 | | TUBING_PRESS | 1198 |
| | Perforation Data: | | Interval Top: | 7562 ft. | # Of Holes: | 1621 | | Interval Bottom: | 16473 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/20/2018 Interval Top: 7562 ft. Interval Bottom: 16473 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/20/2018 | Treatment End Date: | N/A | | Treatment Summary: | Producing intervals: 7562'-9714'; 10759'-16473' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7562 ft. | # Of Holes: | 1435 | | Interval Bottom: | 16473 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3714 |
| Total Gas Produced (MCF) | 91359 |
| GOR | 24598 |
| GOR Determination | MCFE |
| Average BOE per Day | 53.274 |
| Average MCFE per Day | 308.984 |
| Federal Financial Assurance | i | |
|
|