Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44427
Well Classification: OW Status: PR - 2/17/2022
Well Name/No:GP CBJ FED #17W-25-01
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/17/2022
FacilityID:449654LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4673 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:602FNL  1255 FELLat/Long: 40.390208 / -104.682327Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390207 / -104.682329Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2021
End Date: 1/1/2022
Reported: 7/8/2022
Days to report: 188
Disclosure: Sidetrack #00
Start Date: 12/21/2021
End Date: 1/1/2022
Reported: 1/18/2022
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/17/2022             Measured TD: 19159 ft.    Vertical TD: 6839 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/17/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/14/2024
Proposed Top PZ Location:Sec:17 Twp: 5N 65W Footage: 2193 FSL  1244 FEL
Bottom Hole Location:Sec:15 Twp: 5N 65W Footage: 2165 FSL  460 FEL
Proposed Depth/Form:19210 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2896 , Unit Acreage: 800, Drill Unit: T5N R65W: Sec. 17-SE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19210 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2580, Top: , Bottom: 19210 ft.
Casing:String Type: 1ST LINER, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17548 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1655, Top: 1500 ft., Bottom: 17548 ft.

Wellbore Completed
Completion Date:11/25/2021
Spud Date:9/25/2021Spud Date Is:ACTUAL
Measured TD:19159 ft.Measured PB depth:19151 ft.
True Vertical TD:6839 ft.True Vertical PB depth:6839 ft.
Top PZ Location:Sec:17 Twp: 5N 65WFootage: 2191 FSL  1224 FEL
Bottom Hole Location:Sec:15 Twp: 5N 65WFootage: 2199 FSL  458 FEL
Log Types:CBL, Mud, MWD/LWD, (Dual Induction on 123-24990).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1668 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1668 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19151 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2975, Top: 84 ft., Bottom: 19151 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3966 ft.NN
SUSSEX4419 ft.NN
SHANNON5068 ft.NN
NIOBRARA7528 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/17/2022                 Interval Top: 7829 ft.    Interval Bottom: 18996 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/3/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/21/2021Treatment End Date:1/1/2022
Treatment Summary:Frac'd Niobrara with 58 stage plug and perf: 6749095 total lbs proppant pumped: 2832395 lbs 40/70 mesh and 3916700 lbs 30/50 mesh. 225727 total bbls fluid pumped: 202785 bbls gelled fluid, 22258 bbls fresh water, and 684 bbls 15% HCl acid.
Total fluid used in treatment (bbls):225727Max pressure during treatment (psi):8501
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:58
Total acid used in treatment (bbls):684Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):22258Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6749095Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7743 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/17/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 253
BBLS_OIL 406
BTU_GAS 1323
CALC_BBLS_H2O 253
CALC_BBLS_OIL 406
CALC_GOR 5887
CALC_MCF_GAS 2390
CASING_PRESS 2739
GRAVITY_OIL 52
MCF_GAS 2390
TUBING_PRESS 2213
Perforation Data:
Interval Top:7829 ft.# Of Holes:1711
Interval Bottom:18996 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)19367
Total Gas Produced (MCF)277550
GOR14331
GOR DeterminationBOE
Average BOE per Day184.278
Average MCFE per Day1068.820

 Federal Financial Assurance  i 

 Tribal Well  i No