Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44375
Well Classification: OW Status: PR - 10/1/2018
Well Name/No:Hood #14N-22B-M
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2018
FacilityID:449568LocationID:449336
County:WELD #123Location:SESE 20 6N66W 6
Field:WATTENBERG - #90750Elevation:4735 ft.
Planned Location:525FSL  1122 FELLat/Long: 40.467807 / -104.796421Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.467807 / -104.796421Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/28/2017
End Date: 8/4/2017
Reported: 9/25/2017
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2018             Measured TD: 15173 ft.    Vertical TD: 7008 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/7/2019
Proposed Top PZ Location:Sec:21 Twp: 6N 66W Footage: 583 FSL  111 FWL
Bottom Hole Location:Sec:22 Twp: 6N 66W Footage: 569 FSL  2600 FWL
Proposed Depth/Form:14816 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 478, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14816 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1863, Top: 0 ft., Bottom: 14816 ft.

Wellbore Completed
Completion Date:4/14/2017
Spud Date:3/13/2017Spud Date Is:ACTUAL
Measured TD:15173 ft.Measured PB depth:15108 ft.
True Vertical TD:7008 ft.True Vertical PB depth:7006 ft.
Top PZ Location:Sec:21 Twp: 6N 66WFootage: 583 FSL  111 FWL
Bottom Hole Location:Sec:22 Twp: 6N 66WFootage: 569 S  2600 W
Log Types:MWD/LWD, Mud, CBL, (Neutron on 123-44373), (Resistivity on 123-44377).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1751 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1751 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15157 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1990, Top: 15 ft., Bottom: 15042 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3618 ft.NN
SUSSEX4113 ft.NN
SHANNON4725 ft.NN
SHARON SPRINGS6883 ft.NN
NIOBRARA6938 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2018                 Interval Top: 7376 ft.    Interval Bottom: 14973 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/4/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/28/2017Treatment End Date:8/4/2017
Treatment Summary:Plug and perf completion type. 38 stages. 168170 total bbls fluid pumped: 167274 bbls slickwater and gel, 896 bbls 15% HCL acid used. 8484617 lbs. of proppant (100+ 30/50 white sand) pumped.
Total fluid used in treatment (bbls):168170Max pressure during treatment (psi):7865
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):896Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9588
Fresh water used in treatment (bbls):167274Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8484617Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6974 ft.
Tubing Packer Depth:6952 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/28/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 163
BBLS_OIL 368
BTU_GAS 1310
CALC_BBLS_H2O 163
CALC_BBLS_OIL 368
CALC_GOR 1913
CALC_MCF_GAS 704
GRAVITY_OIL 49
MCF_GAS 704
TUBING_PRESS 1566
Perforation Data:
Interval Top:7376 ft.# Of Holes:1368
Interval Bottom:14973 ft.Hole Size:0.46 in.

Formation PRBL                     Formation Classification:  OW                     Status:  AB - 10/11/2018                Interval Top: 7376 ft.    Interval Bottom: 14973 ft.

 Completed Information for Formation PRESSURE BLANKET
1st Production Date:9/15/2018Choke Size: 
Formation Name:PRESSURE BLANKETCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation PRBL.
Perforation Data:
Interval Top:7376 ft.# Of Holes:1368
Interval Bottom:14973 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)4098
Total Gas Produced (MCF)89547
GOR21851
GOR DeterminationMCFE
Average BOE per Day53.283
Average MCFE per Day309.029

 Federal Financial Assurance  i 

 Tribal Well  i No