Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44355
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:Ottesen LE #06-370HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:449537LocationID:449521
County:WELD #123Location:NWSE 33 1N66W 6
Field:WATTENBERG - #90750Elevation:5078 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1410FSL  1683 FELLat/Long: 40.004325 / -104.778697Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.004327 / -104.778700Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/5/2019
End Date: 3/15/2019
Reported: 4/4/2019
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2024             Measured TD: 18459 ft.    Vertical TD: 7773 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/5/2019
Proposed Top PZ Location:Sec:5 Twp: 1S 66W Footage: 515 FSL  460 FEL
Bottom Hole Location:Sec:6 Twp: 1S 66W Footage: 515 FSL  2605 FEL
Proposed Depth/Form:17998 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1844 , Unit Acreage: 906, Drill Unit: All Sec 5, E2 Sec 6
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1737 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 723, Top: 0 ft., Bottom: 1737 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18277 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1287, Top: , Bottom: 18277 ft.

Wellbore Completed
Completion Date:12/14/2018
Spud Date:11/9/2018Spud Date Is:ACTUAL
Measured TD:18459 ft.Measured PB depth:18450 ft.
True Vertical TD:7773 ft.True Vertical PB depth:7772 ft.
Top PZ Location:Sec:5 Twp: 1S 66WFootage: 514 FSL  599 FEL
Bottom Hole Location:Sec:6 Twp: 1S 66WFootage: 520 FSL  2535 FWL
Log Types:Mud, MWD/LWD, CBL (Composite in 123-44337)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1855 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 837, Top: 0 ft., Bottom: 1855 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18459 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1974, Top: 3000 ft., Bottom: 18459 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5730 ft.5891 ft.NN
SUSSEX6261 ft.6599 ft.NN
SHANNON7439 ft.7535 ft.NN
SHARON SPRINGS9567 ft.NN
NIOBRARA9918 ft.NN
FORT HAYS10593 ft.NN
CODELL10744 ft.NN
CARLILE11749 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 15533 ft.    Interval Bottom: 16658 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/6/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:15533 ft.# Of Holes:1080
Interval Bottom:16658 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 11783 ft.    Interval Bottom: 15497 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/6/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:11783-12458;15295-15335;15420-15497
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11783 ft.# Of Holes:1080
Interval Bottom:15497 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/18/2019                Interval Top: 11182 ft.    Interval Bottom: 17660 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/6/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:11182-11183;13095-13497;14495-15058;16695-17660
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11182 ft.# Of Holes:1080
Interval Bottom:17660 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 10983 ft.    Interval Bottom: 18156 ft.

 Completed Information for Formation CODELL
1st Production Date:4/6/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:10983-11135;11220-11735;12499-13056;13533-14255;14295-14458;15095-15258;15383-15384;17695-18156
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10983 ft.# Of Holes:1080
Interval Bottom:18156 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 1/1/2024                  Interval Top: 10983 ft.    Interval Bottom: 18156 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/6/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/5/2019Treatment End Date:3/15/2019
Treatment Summary:409,467# 100 Mesh Sand; 6,827,433# 20/40 Sand; 137,249 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):137249Max pressure during treatment (psi):4326
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14757
Fresh water used in treatment (bbls):137249Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7236900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10436 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 759
BBLS_OIL 318
BTU_GAS 1416
CALC_BBLS_H2O 759
CALC_BBLS_OIL 318
CALC_GOR 1142
CALC_MCF_GAS 363
CASING_PRESS 2200
GRAVITY_OIL 42
MCF_GAS 363
TUBING_PRESS 1500
Perforation Data:
Interval Top:10983 ft.# Of Holes:1080
Interval Bottom:18156 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3900
Total Gas Produced (MCF)31557
GOR8091
GOR DeterminationBOE
Average BOE per Day25.628
Average MCFE per Day148.636

 Federal Financial Assurance  i 

 Tribal Well  i No