Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44351
Well Classification: OW Status: PR - 1/1/2024
Well Name/No:Ottesen LE #09-365HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:449533LocationID:449521
County:WELD #123Location:NWSE 33 1N66W 6
Field:WATTENBERG - #90750Elevation:5082 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1510FSL  1383 FELLat/Long: 40.004600 / -104.777628Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.004605 / -104.777630Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/6/2019
End Date: 2/19/2019
Reported: 3/28/2019
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2024             Measured TD: 17995 ft.    Vertical TD: 7682 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/24/2020
Proposed Top PZ Location:Sec:4 Twp: 1S 66W Footage: 460 FNL  1219 FEL
Bottom Hole Location:Sec:9 Twp: 1S 66W Footage: 370 FSL  1225 FEL
Proposed Depth/Form:17791 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1842 , Unit Acreage: 1244, Drill Unit: S4: All, S9: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17791 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1508, Top: , Bottom: 17791 ft.

Wellbore Completed
Completion Date:1/3/2019
Spud Date:10/29/2018Spud Date Is:ACTUAL
Measured TD:17995 ft.Measured PB depth:17985 ft.
True Vertical TD:7682 ft.True Vertical PB depth:7682 ft.
Top PZ Location:Sec:4 Twp: 1S 66WFootage: 567 FNL  1196 FEL
Bottom Hole Location:Sec:09 Twp: 1S 66WFootage: 197 FSL  1215 FEL
Log Types:Mud, MWD/LWD, CBL (Composite in 123-44337)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1771 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 799, Top: 0 ft., Bottom: 1771 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17995 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1885, Top: 5290 ft., Bottom: 17995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4461 ft.4638 ft.NN
SUSSEX4847 ft.5082 ft.NN
SHANNON5718 ft.5894 ft.NN
SHARON SPRINGS7468 ft.NN
NIOBRARA7608 ft.NN
FORT HAYS8197 ft.NN
CODELL8286 ft.NN
CARLILE8473 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/18/2019                Interval Top: 9312 ft.    Interval Bottom: 10313 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/31/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:9312-9513; 9586-9713; 9949-10313
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9312 ft.# Of Holes:1380
Interval Bottom:10313 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 8785 ft.    Interval Bottom: 17660 ft.

 Completed Information for Formation CODELL
1st Production Date:3/31/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:8785-9264; 9549-9550; 9749-9913; 10349-11826; 12586-17660
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8785 ft.# Of Holes:1380
Interval Bottom:17660 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/18/2019                Interval Top: 8512 ft.    Interval Bottom: 12550 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/31/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/18/2019Treatment End Date:N/A
Treatment Summary:8512-8750; 11862-12550
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8512 ft.# Of Holes:1380
Interval Bottom:12550 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/1/2024                  Interval Top: 8512 ft.    Interval Bottom: 17660 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/31/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/6/2019Treatment End Date:2/19/2019
Treatment Summary:504,547# 100 Mesh Sand; 8,652,735# 20/40 Sand; 161,676 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):161676Max pressure during treatment (psi):4458
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):26307
Fresh water used in treatment (bbls):161676Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9157282Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8124 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 400
BBLS_OIL 205
BTU_GAS 1414
CALC_BBLS_H2O 400
CALC_BBLS_OIL 205
CALC_GOR 517
CALC_MCF_GAS 106
CASING_PRESS 2300
GRAVITY_OIL 42
MCF_GAS 106
TUBING_PRESS 1700
Perforation Data:
Interval Top:8512 ft.# Of Holes:1380
Interval Bottom:17660 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3977
Total Gas Produced (MCF)80919
GOR20346
GOR DeterminationMCFE
Average BOE per Day49.229
Average MCFE per Day285.538

 Federal Financial Assurance  i 

 Tribal Well  i No