Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44337
Well Classification: OW Status: PR - 3/1/2024
Well Name/No:Ottesen LE #06-311HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2024
FacilityID:449518LocationID:449521
County:WELD #123Location:NWSE 33 1N66W 6
Field:WATTENBERG - #90750Elevation:5079 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1410FSL  1623 FELLat/Long: 40.004325 / -104.778483Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.004327 / -104.778482Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/1/2019
End Date: 3/12/2019
Reported: 4/4/2019
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2024             Measured TD: 18174 ft.    Vertical TD: 7754 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/5/2019
Proposed Top PZ Location:Sec:5 Twp: 1S 66W Footage: 1217 FSL  460 FEL
Bottom Hole Location:Sec:6 Twp: 1S 66W Footage: 1225 FSL  2604 FEL
Proposed Depth/Form:17688 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2614 , Unit Acreage: 906, Drill Unit: S5:All, S6:E/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1726 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 718, Top: 0 ft., Bottom: 1726 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17889 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1278, Top: , Bottom: 17889 ft.

Wellbore Completed
Completion Date:12/8/2018
Spud Date:11/5/2018Spud Date Is:ACTUAL
Measured TD:18174 ft.Measured PB depth:18161 ft.
True Vertical TD:7754 ft.True Vertical PB depth:7754 ft.
Top PZ Location:Sec:5 Twp: 1S 66WFootage: 1212 FSL  599 FEL
Bottom Hole Location:Sec:6 Twp: 1S 66WFootage: 1201 FSL  2526 FWL
Log Types:Mud, MWD/LWD, CBL, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1786 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 809, Top: 0 ft., Bottom: 1786 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18174 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1885, Top: 2810 ft., Bottom: 18174 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5527 ft.5695 ft.NN
SUSSEX6073 ft.6352 ft.NN
SHANNON7214 ft.7356 ft.NN
SHARON SPRINGS9528 ft.NN
NIOBRARA9705 ft.NN
FORT HAYS10366 ft.NN
CODELL10607 ft.NN
CARLILE12599 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/10/2019                 Interval Top: 12605 ft.    Interval Bottom: 15768 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/15/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/10/2019Treatment End Date:N/A
Treatment Summary:12605-13967;14930-15768;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12605 ft.# Of Holes:1080
Interval Bottom:15768 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/10/2019                 Interval Top: 11530 ft.    Interval Bottom: 16245 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/15/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/10/2019Treatment End Date:N/A
Treatment Summary:11530-12568;14368-14894;16167-16245;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11530 ft.# Of Holes:1080
Interval Bottom:16245 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 3/1/2024                  Interval Top: 10693 ft.    Interval Bottom: 17845 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/15/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/1/2019Treatment End Date:3/12/2019
Treatment Summary:377,523# 100 Mesh Sand; 6,825,825# 20/40 Sand; 131,383 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):131383Max pressure during treatment (psi):3964
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):23841
Fresh water used in treatment (bbls):131383Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7203348Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10129 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 445
BBLS_OIL 218
BTU_GAS 1416
CALC_BBLS_H2O 445
CALC_BBLS_OIL 218
CALC_GOR 1115
CALC_MCF_GAS 243
CASING_PRESS 1500
GRAVITY_OIL 41
MCF_GAS 243
TUBING_PRESS 844
Perforation Data:
Interval Top:10693 ft.# Of Holes:1080
Interval Bottom:17845 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/10/2019                 Interval Top: 10693 ft.    Interval Bottom: 17845 ft.

 Completed Information for Formation CODELL
1st Production Date:4/15/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/10/2019Treatment End Date:N/A
Treatment Summary:10693-11494;14005-14331; 15805-16131;16293-17845
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10693 ft.# Of Holes:1080
Interval Bottom:17845 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4951
Total Gas Produced (MCF)11821
GOR2387
GOR DeterminationBOE
Average BOE per Day19.169
Average MCFE per Day111.178

 Federal Financial Assurance  i 

 Tribal Well  i No