|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2021 Measured TD: 15629 ft. Vertical TD: 7448 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/2/2019 | | Proposed Top PZ Location: | Sec:3 Twp: 2N 67W | Footage: 115 FSL 125 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 67W | Footage: 2544 FSL 145 FEL | | Proposed Depth/Form: | 15690 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15680 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1851, Top: , Bottom: 15680 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/16/2017 | | Spud Date: | 5/1/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 15629 ft. | Measured PB depth: | 15531 ft. | | True Vertical TD: | 7448 ft. | True Vertical PB depth: | 7452 ft. | | Top PZ Location: | Sec:3 Twp: 2N 67W | Footage: 115 FSL 125 FEL | | Bottom Hole Location: | Sec:34 Twp: 3N 67W | Footage: 2544 FSL 145 FEL | | Log Types: | CBL, MWD, CNL, (RESISTIVITY in 123-33788) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.1 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1828 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 706, Top: 0 ft., Bottom: 1828 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15619 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1540, Top: 813 ft., Bottom: 15619 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4428 ft. | | | | | SHANNON | 4905 ft. | | | | | SHARON SPRINGS | 7154 ft. | | | | | NIOBRARA | 7251 ft. | | | | | FORT HAYS | 7697 ft. | | | | | CODELL | 7794 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 3/5/2018 Interval Top: 11841 ft. Interval Bottom: 11883 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/5/2018 | Treatment End Date: | N/A | | Treatment Summary: | Fort Hays: 11841-11883 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 11841 ft. | # Of Holes: | 464 | | Interval Bottom: | 11883 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 9/1/2021 Interval Top: 7848 ft. Interval Bottom: 15522 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 1/31/2018 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/10/2017 | Treatment End Date: | 12/13/2017 | | Treatment Summary: | PERF AND FRAC FROM 7848-15522. 195 BBL 7 1/2% HCL, 5,285 BBL PUMP DOWN, 136,426 BBL SLICKWATER, 141,906 TOTAL FLUID, 4,156,160# 40/70 OTTAWA/ST. PETERS, 4,156,160# TOTAL SAND. | | Total fluid used in treatment (bbls): | 141906 | Max pressure during treatment (psi): | 7168 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | 195 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1607 | | Fresh water used in treatment (bbls): | 141711 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4156160 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/3/2018 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 57 | | BTU_GAS | 1323 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 57 | | CALC_GOR | 1509 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 750 | | GRAVITY_OIL | 55 | | MCF_GAS | 86 |
| | Perforation Data: | | Interval Top: | 7848 ft. | # Of Holes: | 464 | | Interval Bottom: | 15522 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/5/2018 Interval Top: 7848 ft. Interval Bottom: 15522 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/5/2018 | Treatment End Date: | N/A | | Treatment Summary: | Codell: 7848-11841, 11883-15522 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7848 ft. | # Of Holes: | 464 | | Interval Bottom: | 15522 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 943 |
| Total Gas Produced (MCF) | 11789 |
| GOR | 12501 |
| GOR Determination | BOE |
| Average BOE per Day | 8.159 |
| Average MCFE per Day | 47.285 |
| Federal Financial Assurance | i | |
|
|