Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44316
Well Classification: OW Status: PR - 12/1/2019
Well Name/No:BUTTERBALL #40N-34HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2019
FacilityID:449476LocationID:319164
County:WELD #123Location:NENE 10 2N67W 6
Field:WATTENBERG - #90750Elevation:4915 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:578FNL  674 FELLat/Long: 40.158268 / -104.869543Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158270 / -104.869545Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/8/2017
End Date: 12/20/2017
Reported: 2/6/2018
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2019             Measured TD: 15425 ft.    Vertical TD: 7236 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/2/2019
Proposed Top PZ Location:Sec:3 Twp: 2N 67W Footage: 159 FSL  279 FEL
Bottom Hole Location:Sec:34 Twp: 3N 67W Footage: 2562 FSL  275 FEL
Proposed Depth/Form:15490 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15480 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1827, Top: , Bottom: 15480 ft.

Wellbore Completed
Completion Date:5/21/2017
Spud Date:4/30/2017Spud Date Is:ACTUAL
Measured TD:15425 ft.Measured PB depth:15366 ft.
True Vertical TD:7236 ft.True Vertical PB depth:7235 ft.
Top PZ Location:Sec:3 Twp: 2N 67WFootage: 159 FSL  279 FEL
Bottom Hole Location:Sec:34 Twp: 3N 67WFootage: 2562 FSL  275 FEL
Log Types:CBL, MWD, (CNL in 123-44319, RESISTIVITY in 123-33788)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1843 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 713, Top: 0 ft., Bottom: 1843 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15415 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1580, Top: 96 ft., Bottom: 15415 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4407 ft.
SHANNON4905 ft.
SHARON SPRINGS7254 ft.
NIOBRARA7451 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2019                 Interval Top: 7667 ft.    Interval Bottom: 15358 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/30/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/11/2017Treatment End Date:12/20/2017
Treatment Summary:PERF AND FRAC FROM 7667-15358. 1,300 BBL 7 1/2% HCL, 19,201 BBL PUMP DOWN, 268,600 BBL LIBERTYFR, 289,101 TOTAL FLUID, 2,310,100# 40/70 OTTAWA/ST. PETERS, 2,310,100# TOTAL SAND.
Total fluid used in treatment (bbls):289101Max pressure during treatment (psi):7666
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):1300Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10002
Fresh water used in treatment (bbls):287801Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2310100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/8/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 178
BTU_GAS 1323
CALC_BBLS_H2O 1
CALC_BBLS_OIL 178
CALC_GOR 1522
CALC_MCF_GAS 271
CASING_PRESS 1800
GRAVITY_OIL 55
MCF_GAS 271
Perforation Data:
Interval Top:7667 ft.# Of Holes:894
Interval Bottom:15358 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)4607
Total Gas Produced (MCF)64940
GOR14095
GOR DeterminationBOE
Average BOE per Day43.308
Average MCFE per Day251.212

 Federal Financial Assurance  i 

 Tribal Well  i No