Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44169
Well Classification: OW Status: PR - 5/1/2021
Well Name/No:S.S. MINNOW #14C-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:449181LocationID:449186
County:WELD #123Location:NENW 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4826 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:984FNL  1780 FWLLat/Long: 40.186375 / -104.860855Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.186377 / -104.860854Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/3/2017
End Date: 12/11/2017
Reported: 1/24/2018
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2021             Measured TD: 19477 ft.    Vertical TD: 7329 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/9/2019
Proposed Top PZ Location:Sec:35 Twp: 3N 67W Footage: 276 FNL  1037 FWL
Bottom Hole Location:Sec:14 Twp: 3N 67W Footage: 749 FSL  1092 FWL
Proposed Depth/Form:19471 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 19461 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2314, Top: , Bottom: 19461 ft.

Wellbore Completed
Completion Date:4/12/2017
Spud Date:3/16/2017Spud Date Is:ACTUAL
Measured TD:19477 ft.Measured PB depth:19412 ft.
True Vertical TD:7329 ft.True Vertical PB depth:7333 ft.
Top PZ Location:Sec:35 Twp: 3N 67WFootage: 276 FNL  1037 FWL
Bottom Hole Location:Sec:14 Twp: 3N 67WFootage: 749 FSL  1092 FWL
Log Types:CBL, MWD/GR, (CNL in 05-123-44168, DIL in 05-123-14762)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2376 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 0 ft., Bottom: 2376 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19462 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2624, Top: 0 ft., Bottom: 19462 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4517 ft.
SHARON SPRINGS7108 ft.
NIOBRARA7203 ft.
FORT HAYS7663 ft.
CODELL7765 ft.
CARLILE19006 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/30/2018                 Interval Top: 19006 ft.    Interval Bottom: 19356 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:N/A
Treatment Summary:Carlile: 19006-19187, 19254-19356
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:19006 ft.# Of Holes:656
Interval Bottom:19356 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/30/2018                 Interval Top: 11132 ft.    Interval Bottom: 13730 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 11132-11150, 11187-11543, 13594-13730
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11132 ft.# Of Holes:656
Interval Bottom:13730 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/1/2021                  Interval Top: 7866 ft.    Interval Bottom: 19356 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:1/18/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/4/2017Treatment End Date:12/11/2017
Treatment Summary:PERF AND FRAC FROM 7866-19356. 100 BBL HCL-7.5, 200,405 BBL LIBERTYFR, 10,246 BBL TREATED WATER, 210,751 TOTAL FLUID, 5,812,320# 40/70 OTTAWA/ST. PETERS, 5,812,320# TOTAL SAND.
Total fluid used in treatment (bbls):210751Max pressure during treatment (psi):7511
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):100Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):1650Total flowback volume recovered (bbls):7741
Fresh water used in treatment (bbls):209001Disposition method For flowback:RECYCLE
Total proppant used (lbs):5812320Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 121
BBLS_OIL 78
BTU_GAS 1280
CALC_BBLS_H2O 121
CALC_BBLS_OIL 78
CALC_GOR 2410
CALC_MCF_GAS 188
CASING_PRESS 950
GRAVITY_OIL 57
MCF_GAS 188
Perforation Data:
Interval Top:7866 ft.# Of Holes:656
Interval Bottom:19356 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/30/2018                 Interval Top: 7866 ft.    Interval Bottom: 19254 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:N/A
Treatment Summary:Codell: 7866-11132, 11150-11187, 11543-13594, 13730-19006, 19187-19254
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7866 ft.# Of Holes:656
Interval Bottom:19254 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3886
Total Gas Produced (MCF)53649
GOR13805
GOR DeterminationBOE
Average BOE per Day36.036
Average MCFE per Day209.020

 Federal Financial Assurance  i 

 Tribal Well  i No