Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44168
Well Classification: OW Status: PR - 1/29/2018
Well Name/No:S.S. MINNOW #23C-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/29/2018
FacilityID:449180LocationID:449186
County:WELD #123Location:NENW 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4826 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:983FNL  1840 FWLLat/Long: 40.186374 / -104.860640Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.186376 / -104.860640Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/14/2017
End Date: 12/22/2017
Reported: 1/30/2018
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/29/2018             Measured TD: 20221 ft.    Vertical TD: 7343 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/29/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/9/2019
Proposed Top PZ Location:Sec:35 Twp: 3N 67W Footage: 327 FNL  2376 FWL
Bottom Hole Location:Sec:14 Twp: 3N 67W Footage: 1564 FSL  2390 FWL
Proposed Depth/Form:20187 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 880, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20177 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2401, Top: , Bottom: 20177 ft.

Wellbore Completed
Completion Date:5/9/2017
Spud Date:3/20/2017Spud Date Is:ACTUAL
Measured TD:20221 ft.Measured PB depth:20145 ft.
True Vertical TD:7343 ft.True Vertical PB depth:7343 ft.
Top PZ Location:Sec:35 Twp: 3N 67WFootage: 266 FNL  2365 FWL
Bottom Hole Location:Sec:14 Twp: 3N 67WFootage: 1562 FSL  2378 FWL
Log Types:CBL, MWD/GR, CNL, (DIL in 05-123-14762)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2327 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 907, Top: 0 ft., Bottom: 2327 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20208 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2710, Top: 0 ft., Bottom: 20208 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4455 ft.
SHARON SPRINGS7061 ft.
NIOBRARA7221 ft.
FORT HAYS7620 ft.
CODELL7713 ft.
CARLILE13611 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/30/2018                 Interval Top: 13611 ft.    Interval Bottom: 13857 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:N/A
Treatment Summary:Carlile: 13611-13857
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13611 ft.# Of Holes:608
Interval Bottom:13857 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/30/2018                 Interval Top: 11619 ft.    Interval Bottom: 11848 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 11619-11848
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11619 ft.# Of Holes:608
Interval Bottom:11848 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/29/2018                 Interval Top: 7799 ft.    Interval Bottom: 20112 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:1/18/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/5/2017Treatment End Date:12/22/2017
Treatment Summary:PERF AND FRAC FROM 7799-20112. 119 BBL HCL-7.5, 171,545 BBL LIBERTYFR, 10,041 BBL TREATED WATER, 181,705 TOTAL FLUID, 4,952,206# 40/70 OTTAWA/ST. PETERS, 4,952,206# TOTAL SAND.
Total fluid used in treatment (bbls):181705Max pressure during treatment (psi):7788
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:31
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):1950Total flowback volume recovered (bbls):3836
Fresh water used in treatment (bbls):179636Disposition method For flowback:RECYCLE
Total proppant used (lbs):4952206Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 121
BBLS_OIL 78
BTU_GAS 1280
CALC_BBLS_H2O 121
CALC_BBLS_OIL 78
CALC_GOR 2410
CALC_MCF_GAS 188
CASING_PRESS 1450
GRAVITY_OIL 57
MCF_GAS 188
Perforation Data:
Interval Top:7799 ft.# Of Holes:608
Interval Bottom:20112 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/30/2018                 Interval Top: 7799 ft.    Interval Bottom: 20112 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/30/2018Treatment End Date:N/A
Treatment Summary:Codell: 7799-11619, 11848-13611, 13857-20112
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7799 ft.# Of Holes:608
Interval Bottom:20112 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)8002
Total Gas Produced (MCF)93994
GOR11746
GOR DeterminationBOE
Average BOE per Day66.332
Average MCFE per Day384.739

 Federal Financial Assurance  i 

 Tribal Well  i No