Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44123
Well Classification: OW Status: PR - 1/3/2018
Well Name/No:CHICA #4N-23HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/3/2018
FacilityID:449029LocationID:449025
County:WELD #123Location:NWNW 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4843 ft.
Planned Location:316FNL  312 FWLLat/Long: 40.188305 / -104.866147Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.188305 / -104.866147Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/13/2017
End Date: 11/24/2017
Reported: 1/9/2018
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/3/2018             Measured TD: 17488 ft.    Vertical TD: 7131 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/3/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/26/2019
Proposed Top PZ Location:Sec:35 Twp: 3N 67W Footage: 30 FNL  299 FWL
Bottom Hole Location:Sec:23 Twp: 3N 67W Footage: 523 FNL  323 FWL
Proposed Depth/Form:17433 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17423 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2064, Top: , Bottom: 17423 ft.

Wellbore Completed
Completion Date:5/1/2017
Spud Date:3/11/2017Spud Date Is:ACTUAL
Measured TD:17488 ft.Measured PB depth:17384 ft.
True Vertical TD:7131 ft.True Vertical PB depth:7135 ft.
Top PZ Location:Sec:35 Twp: 3N 67WFootage: 30 FNL  299 FWL
Bottom Hole Location:Sec:23 Twp: 3N 67WFootage: 523 FNL  323 FWL
Log Types:CBL, MWD, (CNL in 123-44120, DIL in 123-18423)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 120 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2339 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 905, Top: 0 ft., Bottom: 2339 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17478 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2315, Top: 0 ft., Bottom: 17478 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4443 ft.
SHARON SPRINGS7087 ft.
NIOBRARA7236 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/3/2018                  Interval Top: 7411 ft.    Interval Bottom: 17270 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/13/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/28/2017Treatment End Date:11/24/2017
Treatment Summary:PERF AND FRAC FROM 7411-17270. 395 BBL HCL-7.5, 267,323 BBL LIBERTYFR, 12,175 BBL TREATED WATER, 279,893 TOTAL FLUID, 7,920,810# 40/70 OTTAWA/ST. PETERS, 7,920,810# TOTAL SAND.
Total fluid used in treatment (bbls):279893Max pressure during treatment (psi):7818
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):395Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):1350Total flowback volume recovered (bbls):7361
Fresh water used in treatment (bbls):278148Disposition method For flowback:RECYCLE
Total proppant used (lbs):7920810Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7179 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/3/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 15
BTU_GAS 1295
CALC_BBLS_H2O 30
CALC_BBLS_OIL 15
CALC_GOR 2533
CALC_MCF_GAS 38
CASING_PRESS 1450
GRAVITY_OIL 54
MCF_GAS 38
TUBING_PRESS 1350
Perforation Data:
Interval Top:7411 ft.# Of Holes:885
Interval Bottom:17270 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)4795
Total Gas Produced (MCF)106721
GOR22256
GOR DeterminationMCFE
Average BOE per Day63.476
Average MCFE per Day368.187

 Federal Financial Assurance  i 

 Tribal Well  i No