Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44120
Well Classification: OW Status: PR - 1/3/2018
Well Name/No:CHICA #31C-23HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/3/2018
FacilityID:449026LocationID:449025
County:WELD #123Location:NWNW 35 3N67W 6
Field:WATTENBERG - #90750Elevation:4843 ft.
Planned Location:301FNL  312 FWLLat/Long: 40.188346 / -104.866147Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.188345 / -104.866146Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/13/2017
End Date: 11/23/2017
Reported: 1/9/2018
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/3/2018             Measured TD: 17219 ft.    Vertical TD: 7373 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/3/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/26/2019
Proposed Top PZ Location:Sec:26 Twp: 3N 67W Footage: 224 FSL  60 FWL
Bottom Hole Location:Sec:23 Twp: 3N 67W Footage: 921 FNL  81 FWL
Proposed Depth/Form:17186 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17176 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2034, Top: , Bottom: 17176 ft.

Wellbore Completed
Completion Date:5/8/2017
Spud Date:3/10/2017Spud Date Is:ACTUAL
Measured TD:17219 ft.Measured PB depth:17208 ft.
True Vertical TD:7373 ft.True Vertical PB depth:7373 ft.
Top PZ Location:Sec:26 Twp: 3N 67WFootage: 224 FSL  60 FWL
Bottom Hole Location:Sec:23 Twp: 3N 67WFootage: 921 FNL  81 FWL
Log Types:CBL, MWD, CNL, (DIL in 123-18423)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 120 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2330 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 888, Top: 0 ft., Bottom: 2330 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17209 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2300, Top: 0 ft., Bottom: 17209 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4454 ft.
SHARON SPRINGS7073 ft.
NIOBRARA7191 ft.
FORT HAYS7686 ft.
CODELL7800 ft.
CARLILE16773 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/19/2018                 Interval Top: 16777 ft.    Interval Bottom: 16985 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2018Treatment End Date:N/A
Treatment Summary:Carlile: 16777-16985
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:16777 ft.# Of Holes:546
Interval Bottom:16985 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/19/2018                 Interval Top: 7807 ft.    Interval Bottom: 16777 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2018Treatment End Date:N/A
Treatment Summary:Codell: 7807-8296, 8381-12893, 12927-16777
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7807 ft.# Of Holes:546
Interval Bottom:16777 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/3/2018                  Interval Top: 7797 ft.    Interval Bottom: 16985 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/18/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/28/2017Treatment End Date:11/23/2017
Treatment Summary:PERF AND FRAC FROM 7797-16985. 233 BBL HCL-7.5, 166,637 BBL LIBERTYFR, 6,860 BBL TREATED WATER, 173,730 TOTAL FLUID, 5,085,830 # 40/70 OTTAWA/ST. PETERS, 5,085,830 # TOTAL SAND.
Total fluid used in treatment (bbls):173730Max pressure during treatment (psi):7506
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):233Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):1200Total flowback volume recovered (bbls):7361
Fresh water used in treatment (bbls):172307Disposition method For flowback:RECYCLE
Total proppant used (lbs):5085830Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7277 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/3/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 388
BBLS_OIL 15
BTU_GAS 1295
CALC_BBLS_H2O 388
CALC_BBLS_OIL 15
CALC_GOR 2533
CALC_MCF_GAS 38
CASING_PRESS 2400
GRAVITY_OIL 54
MCF_GAS 38
TUBING_PRESS 1500
Perforation Data:
Interval Top:7797 ft.# Of Holes:546
Interval Bottom:16985 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/19/2018                 Interval Top: 7797 ft.    Interval Bottom: 12927 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/19/2018Treatment End Date:N/A
Treatment Summary:Fort Hays: 7797-7807, 8296-8381, 12893-12927
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7797 ft.# Of Holes:546
Interval Bottom:12927 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)7428
Total Gas Produced (MCF)93803
GOR12628
GOR DeterminationBOE
Average BOE per Day64.660
Average MCFE per Day375.005

 Federal Financial Assurance  i 

 Tribal Well  i No