|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2019 Measured TD: 17790 ft. Vertical TD: 7230 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/6/2018 | Proposed Top PZ Location: | Sec:5 Twp: 6N 67W | Footage: 558 FNL 2218 FEL | Bottom Hole Location: | Sec:3 Twp: 6N 67W | Footage: 648 FNL 2697 FEL | Proposed Depth/Form: | 18011 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18011 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1600, Top: 1500 ft., Bottom: 18011 ft. |
| | |
Wellbore Completed | Completion Date: | 12/17/2016 | Spud Date: | 11/16/2016 | Spud Date Is: | ACTUAL | Measured TD: | 17790 ft. | Measured PB depth: | 17766 ft. | True Vertical TD: | 7230 ft. | True Vertical PB depth: | 7227 ft. | Top PZ Location: | Sec:5 Twp: 6N 67W | Footage: 558 FNL 2218 FEL | Bottom Hole Location: | Sec:3 Twp: 6N 67W | Footage: 648 N 2697 E | Log Types: | CBL, MUD, MWD/LWD, (Triple Combo on API 123-43857). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1555 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1555 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17768 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2265, Top: 1110 ft., Bottom: 17768 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3507 ft. | | N | N | SUSSEX | 4096 ft. | | N | N | SHANNON | 4681 ft. | | N | N | SHARON SPRINGS | 7166 ft. | | N | N | NIOBRARA | 7211 ft. | | N | N | FORT HAYS | 7748 ft. | | N | N | CODELL | 7960 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 2/2/2018 Interval Top: 7960 ft. Interval Bottom: 17714 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/2/2018 | Treatment End Date: | N/A | Treatment Summary: | Producing intervals: 7960'-16905'; 17300'-17714' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7960 ft. | # Of Holes: | 1669 | Interval Bottom: | 17714 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 6/1/2019 Interval Top: 7810 ft. Interval Bottom: 17714 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 7/10/2017 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/28/2017 | Treatment End Date: | 3/17/2017 | Treatment Summary: | 50 stage plug and perf;
162647 total bbls of fluid pumped: 162635 bbls fresh water and 12 bbls 15% HCL acid pumped;
10000070 total lbs of 30/50 proppant pumped. | Total fluid used in treatment (bbls): | 162647 | Max pressure during treatment (psi): | 8705 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | Type Of gas: | | Number Of staged intervals: | 50 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 9128 | Fresh water used in treatment (bbls): | 162635 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 10000070 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7666 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/11/2017 | Test Method: | | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1025 | BBLS_OIL | 373 | BTU_GAS | 1357 | CALC_BBLS_H2O | 1025 | CALC_BBLS_OIL | 373 | CALC_GOR | 1080 | CALC_MCF_GAS | 403 | CASING_PRESS | 1409 | GRAVITY_OIL | 41 | MCF_GAS | 403 | TUBING_PRESS | 1824 |
| Perforation Data: | Interval Top: | 7810 ft. | # Of Holes: | 1765 | Interval Bottom: | 17714 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 2/2/2018 Interval Top: 7810 ft. Interval Bottom: 17300 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 2/2/2018 | Treatment End Date: | N/A | Treatment Summary: | Producing interval: 7810'-7960'; 16905'-17300' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7810 ft. | # Of Holes: | 96 | Interval Bottom: | 17300 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2417 |
Total Gas Produced (MCF) | 13909 |
GOR | 5754 |
GOR Determination | BOE |
Average BOE per Day | 13.134 |
Average MCFE per Day | 76.198 |
Federal Financial Assurance | i | |
|
|